Permit: T22CM04922

Parcel: 11706077R


Addresses:

211 N 4TH AV


Inspection Status: Partial Pass

Inspection History: COT - HCBU - Masonry Pregrout 

Permit Number - T22CM04922

Inspection Description - COT - HCBU - Masonry Pregrout 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
02/13/2023 COT - HCBU - Masonry Pregrout  Partial Pass Level #2 crash wall at GL: 1/A - D at 54”. Water room #B103 CMU walls at 0” - 48”. Ok to place grout in progress areas.
02/15/2023 COT - HCBU - Masonry Pregrout  Canceled Contractor cancelled.
02/21/2024 COT - HCBU - Masonry Pregrout  Partial Pass CMU planter walls at 4’ top out on Level #3, East side of building. Ok to place grout in progress areas.
02/28/2023 COT - HCBU - Masonry Pregrout  Not Ready Contractor cancelled.
03/04/2024 COT - HCBU - Masonry Pregrout  Partial Pass Masonry pre-grout on Level #3 spa/pool area at North end; fire -lace and planters at 0” - 48”. Ok to place grout in progress areas. Level #13 MEP in units 1312, 1313, 1314, 1315, 1316, 1317, 1318 (1319 and 1321 need hangers for,domestic water lines),1320, 1322. Ok to insulate and cover walls.
03/08/2023 COT - HCBU - Masonry Pregrout  Partial Pass Area B, West wall at 0’ - 4 ‘. Ok to place grout in progress areas
03/17/2023 COT - HCBU - Masonry Pregrout  Partial Pass CMU Crash walls at GL: N/10 - 10.6; 10.6/N - R; R/10.6 - 15.8. Ok to place grout in progress areas.
03/22/2023 COT - HCBU - Masonry Pregrout  Partial Pass CMU wall at 4’8” - 9’6” at GL: A/2 - 7, Area A, Electric room at GL: J/4.5 - 5.5, J - K/4.5 - 5.5; Stair C at GL: Q/11 - 12. Ok to place grout in progress areas.
03/28/2023 COT - HCBU - Masonry Pregrout  Not Ready Not ready. Contractor cancelled. Reschedule for 29 March
03/29/2023 COT - HCBU - Masonry Pregrout  Partial Pass CMU walls at GL: A/1 - 7 at 10’5”; F/8 - 8.5 at 4’. Ok to grout progress areas.
03/30/2023 COT - HCBU - Masonry Pregrout  Partial Pass Excavation/layout rebar: Level #3: columns at GL: 13/L; 13/M, 13/N, L/10. Shear wall #11, Ok to place concrete in progress areas.
04/03/2023 COT - HCBU - Masonry Pregrout  Partial Pass CMU wall at GL: A/2 - 7, topped out. CMU Crash wall at GL: 7/B - C at 0’ - 4’ AFF. Ok to place grout in progress areas.
04/05/2023 COT - HCBU - Masonry Pregrout  Partial Pass CMU walls at GL: 1/B - C at 8’ - 12’ AFFE; G - J/3 at 8’ - 12’. Ok to place grout in progress areas.
04/10/2023 COT - HCBU - Masonry Pregrout  Partial Pass C U wall at GL: A.1/C - G.4 at 4’ above floor level. Ok to place grout in progress areas.
04/14/2023 COT - HCBU - Masonry Pregrout  Not Ready Contractor cancelled.
04/17/2023 COT - HCBU - Masonry Pregrout  Partial Pass Level #3, columns at GL: 6/F, 6/G, 6/G.6, G/6.6, 7/G, 5.5/E, 4.5/E. OK to set forms and place concrete in progress areas.
CMU walls at GL; G.6/2.4 - 4.4, G.6/H.9. OK to place grout in progress areas.
04/20/2023 COT - HCBU - Masonry Pregrout  Partial Pass CMU walls at GL: N - Q/7, 10.6 - 8/N - Q at 12 feet AFFE. OK to place grout in progress areas. Level #4 columns at GL: B.1/8, 7/A, 6/A, 6/B, 6/C. OK to set forms and place concrete.
05/09/2023 COT - HCBU - Masonry Pregrout  Partial Pass Inspection should read excavation layout/rebar for columns on Level #5 at GL: M.3/6.8, M/7, N/7.5, N/8.5, N/10, M/10, L/10, M/8, L.5/8. Ok to set forms and place concrete in progress areas.
05/10/2023 COT - HCBU - Masonry Pregrout  Partial Pass Level #1: CMU Crash wall at GL: C - G (west wall). CMU walls at Fire pump room, North and East walls, topped out. North CMU wall of bike room, 2nd lift. Trash room CMU Walla at 2nd lift. Ramp area at Stair B; 2nd lift.
05/15/2023 COT - HCBU - Masonry Pregrout  Not Ready Contractor cancelled.
05/17/2023 COT - HCBU - Masonry Pregrout  Partial Pass Inspection should read: excavation layout rebar for columns on Level #6 at GL; C/1, C/2, C/3, C/4, F/4.5, E/4.5, F.8/1, G/2. OK to set forms and place concrete in progress areas.
05/19/2023 COT - HCBU - Masonry Pregrout  Partial Pass Northwest corner at GL:B/2. Crash wall at GL: E.5 -6/1 -2. Column at 3/F, Shear wall #5. Ok to place concrete in progress areas.
08/01/2024 COT - HCBU - Masonry Pregrout  Passed
08/10/2023 COT - HCBU - Masonry Pregrout  Partial Pass Level #3, amenities site wall at 4’ - 8’. Ok to grout progress areas. Level #2, crash wall at trash chute area; topped out. Ok to grout progress areas.
08/15/2023 COT - HCBU - Masonry Pregrout  Partial Pass Level #3, amenities area, top out masonry walls. Ok to place grout in progress area.
09/22/2023 COT - HCBU - Masonry Pregrout  Partial Pass 9/22/23: Stair D East wall second lift 5'4" lift ok to pour.
10/03/2023 COT - HCBU - Masonry Pregrout  Partial Pass Stairwell D, 4th Avenue side, topped out at 24’8” - 32’. Ok to grout progress areas.