Permit Details

Status:
In Revision
Type:
Commercial Building
Apply Date:
05/24/2022
Applicant:
Adam Jones
Description:
NEW INDUSTRIAL WAREHOUSE BUILDING

Permit Reviews

Permit Number - T22CM03955
Permit Status: In revision
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Start Date Submittal Complete Date Status  
05/24/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 10/14/2022 COMPLETED Review Details
10/18/2022 RESUBMITTAL 10/20/2022 ACTIVE Review Details
11/20/2024 COMMERCIAL REVIEW - FULL REVISION v.1 12/16/2024 REQUIRES RESUBMIT Review Details
12/19/2024 COMMERCIAL REVIEW - FULL REVISION v.2 01/09/2025 REQUIRES RESUBMIT Review Details
01/16/2025 COMMERCIAL REVIEW - FULL REVISION v.3 01/16/2025 IN REVIEW Review Details
10/28/2022 COMMERCIAL REVIEW - FULL v.1 12/07/2022 REQUIRES RESUBMIT Review Details
06/22/2023 RESTAMP - COMMERCIAL v.1 09/13/2023 REQUIRES RESUBMIT Review Details
06/26/2024 COMMERCIAL REVIEW - FULL v.1 08/20/2024 APPROVED Review Details
01/28/2025 COMMERCIAL REVIEW - FULL REVISION v.4 N/A IN REVIEW Review Details
06/07/2023 COMMERCIAL REVIEW - FULL v.2 06/22/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM03955
Permit Status: In revision
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Total Outstanding Activity Conditions - 15
Date Name
08/21/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
08/21/2024 Girder Designs must be submitted and approved prior to final.
08/21/2024 Roof Ladder Designs must be submitted and approved prior to final.
08/21/2024 SPECIAL INSPECTION FOR Plywood Roof Diaphragm IS REQUIRED
08/21/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
08/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/21/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
08/21/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - T22CM03955
Permit Status: In revision
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Date Description Comments
08/21/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
08/21/2024 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/21/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: In Revision
Permit Number: T22CM03955
Permite Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
11/26/2024 COT - HCPL - Rough Soil N/A Partial Pass 11/15/24: plumbing underground per plans at GL 1-10 ok to proceed with backfill
11/19/24: 150' run of plumbing underground per plans ok to proceed.
11/21/24: plumbing underground per plans at GL1-5 ok to proceed with backfill.
11/26/24: plumbing underground along GL 1.5 from GL A.5 to GL E.
01/28/2025 COT - HCBU - Building Progress N/A Partial Pass 1/23/25: panels 32-59 ok to pour
1/28/25: reinforcement per plan at panel pour 4. Ok to proceed
11/07/2024 COT - HCEL - Electrical Underground N/A Partial Pass 11/7/24: Electrical underground for lighting,security, egress lighting. Ok yo back fill GL A-E/12
11/20/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 11/1/24: reinforcement per plan at continuous footing at GL E/1-18, spread footings per plan at GL B-D/2-8 and B-D/10-17. Ok for concrete placement
11/7/24: Reinforcement per plans at Spread footers at GL A-E/9, continuous footer at GL A/1-18 and 18/A-E per plan ok to proceed.
11/20/24: reinforcement at slab per plan at pour 1 GL 9-13.
01/29/2025 COT - HCEL - Electrical Progress N/A Partial Pass 1/29/25: electrical underground per plans at SES location at west half of building 3. Ok to backfill.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
I-10 INTERNATIONAL RESPONSE TO 06-22-2023 COMMENTS-C_V1.PDF DOCUMENTS VIEW
CONS-2_CIVIL-LANDSCAPE DEVELOPMENT PACKAGE_V2_V1.PDF DOCUMENTS VIEW
I-10 INTERNATIONAL RESPONSE TO COM-C1_V3_V1.PDF DOCUMENTS VIEW