Address Search: 4150 E LOS REALES RD
Search
Permits
Address: 4150 E LOS REALES RD
Date - 01/31/2025 5:04 a.m.
Total Number Of Permits - (21)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TF-FCP-1224-01094 | In Review | 12/17/2024 | N/A | BLDG 3 | Fire Construction Permit | There is a total of (6) new wet pipe sprinkler systems in Building 3. (3) Risers will be fed from an electric fire pump rated for 1500GPM at 115PSI. This pump is located in the pump room connected to the building, near Column 18 of Grid A. (3) remote risers are located near Column 10 of Grid A. They will be fed from the pump room located near Column 18 of Grid A. |
TF-FCP-1224-01095 | In Review | 12/17/2024 | N/A | BLDG 2 | Fire Construction Permit | There is a total of (4) new wet pipe systems in Building 2. (4) Remote risers will be fed from the lead-in located near Column 6 of Grid A in Building 2. The (4) remote risers in Building 2 are fed by the pump room located in Building 3. |
TF-FCP-1224-01026 | Void | 12/03/2024 | N/A | Fire Construction Permit | VOID- Contractor resubmitted for each building and this was for the 2 buildings combined - Need Construction Permit to add underground fire line. | |
TF-FCP-1224-01027 | Issued | 12/03/2024 | 06/16/2025 | BLDG 2 | Fire Construction Permit | EXPEDITE - Install Underground Private Fire Line |
TF-FCP-1224-01028 | Inspections | 12/03/2024 | 06/16/2025 | BLDG 3 | Fire Construction Permit | EXPEDITE - Install Underground Private Fire Line |
TC-UTL-1122-00015 | Approved | 11/23/2022 | 02/18/2025 | Utilities Permit | 1st submittal to Building Codes for the private sewer connection to the proposed buildings | |
TR-PIA-1122-00001 | Approved | 11/21/2022 | N/A | Private Improvement Agreement (PIA) | New roadway improvements for Alvernon Way and Los Reales Road. | |
TR-UTL-1124-02181 | Inspections | 11/18/2024 | 02/14/2025 | BLDG 1 | Right-of-Way (ROW) - Utility | Installing public off-site sewer for the I-10 International buildings being built on the SE corner of E. Los Reales and S. Alvernon Way. Sewer extends from existing manhole east of the intersection and extends 110-125lf east and then directly south. |
TD-DEV-1124-00302 | Void | 11/07/2024 | 11/07/2025 | Development Package | VOID - Customer to continue with DP22-0122 -Phased revision to previously approved development plan | |
TE-FPU-1122-00012 | Issued | 11/04/2022 | 12/31/2025 | Floodplain Use | Submittal of the CLOMR | |
TE-FPU-1122-00006 | Issued | 11/02/2022 | N/A | Floodplain Use | ||
TZ-PMT-1024-00073 | Fees Paid | 10/11/2024 | N/A | Zoning Permit Annual | Temporary Construction Trailer | |
TC-FBB-0724-00141 | Needs Resubmittal | 07/26/2024 | N/A | Factory Built Buildings | Construction Trailer | |
T22CM03953 | Fees Due | 05/24/2022 | N/A | BLDG 1 | Commercial Building | NEW INDUSTRIAL WAREHOUSE BUILDING - BUILDING 1 |
T22CM03954 | Needs Resubmittal | 05/24/2022 | 07/22/2025 | BLDG 2 | Commercial Building | NEW INDUSTRIAL WAREHOUSE BUILDING |
T22CM03955 | In Revision | 05/24/2022 | 07/28/2025 | BLDG 3 | Commercial Building | NEW INDUSTRIAL WAREHOUSE BUILDING |
DP22-0122 | In Revision | 05/09/2022 | 11/26/2027 | Development Package | Revision 1 - Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage. | |
TF-FCP-0125-00058 | Needs Resubmittal | 01/21/2025 | N/A | BLDG 2 | Fire Construction Permit | Installation of Fire Alarm System for Sprinkler Monitoring. |
TF-FCP-0125-00059 | Needs Resubmittal | 01/21/2025 | N/A | BLDG 3 | Fire Construction Permit | Installation of a New Fire Alarm Sytem for Sprinkler Monitoring. |
TC-COM-0125-00114 | Void | 01/17/2025 | N/A | BLDG 2 | Commercial Building | ** VOID: YL- Unable to process for incorrect permit type. According to the permit description and Fire sprinkler monitoring device location plan, please apply for a Fire Construction Permit. This permit will be voided as it is not the correct permit type. For questions, Building_Official@tucsonaz.gov or you can visit the Tucson Fire Department (TFD) contact us section at: https://www.tucsonaz.gov/Departments/Fire/Get-Fire-Permits-and-Code-Info ** - Installing New Fire Alarm System for Sprinkler Monitoring. Core and Shell. |
TC-COM-0125-00115 | Void | 01/17/2025 | N/A | BLDG 3 | Commercial Building | ** VOID: YL- Unable to process for incorrect permit type. According to the permit description and Fire sprinkler monitoring device location plan, please apply for a Fire Construction Permit. This permit will be voided as it is not the correct permit type. For questions, Building_Official@tucsonaz.gov or you can visit the Tucson Fire Department (TFD) contact us section at: https://www.tucsonaz.gov/Departments/Fire/Get-Fire-Permits-and-Code-Info ** - Installation of New Fire Alarm System for Sprinkler Monitoring. |
Plans
Address: 4150 E LOS REALES RD
Date - 01/31/2025 5:04 a.m.
Total Number Of Plans - (11)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CWH-22-0122 | Active | 05/09/2022 | 05/09/2023 | -- Commercial Water Harvesting Ordinance | Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage. | |
TE-BAS-0623-00052 | Approved | 06/27/2023 | N/A | -- Commercial Water Harvesting Ordinance | Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage. | |
TW-MWP-0323-00034 | Void | 03/08/2023 | 03/07/2024 | -- Water Master Plan - Overall/Phased | DUPLICATE! 1st submittal of the revised Master Water Plan- this is a revision for MWP-1122-00003 that needs to be submitted under that case | |
TW-MWP-1122-00003 | Accepted | 11/04/2022 | 11/04/2023 | -- Water Master Plan - Single-Phase | I-10 International Buildings 1, 2 & 3 | |
TW-MWP-1224-00070 | Needs Resubmittal | 12/27/2024 | 12/27/2025 | -- Water Master Plan - Overall/Phased | I-10 International Overall MWP | |
TW-MWP-1224-00070 | Needs Resubmittal | 12/27/2024 | 12/27/2025 | BLDG 1 | -- Water Master Plan - Overall/Phased | I-10 International Overall MWP |
TW-MWP-1224-00071 | Needs Resubmittal | 12/27/2024 | 12/27/2025 | -- Water Master Plan - Single-Phase | Master Water plan - Phase 1 for I-10 International | |
TW-WAV-0324-00034 | Approved | 03/07/2024 | 03/07/2026 | -- Water Availability | Request for an updated water availability. | |
TW-WAV-1224-00236 | Approved | 12/31/2024 | 12/31/2026 | -- Water Availability | I-10 International | |
TW-WCP-0123-00045 | Accepted | 01/10/2023 | 01/10/2025 | -- Water Design Plan | 1st Design I-10 International buildings 1, 2, 3 | |
TW-WCP-1222-00039 | Void | 12/28/2022 | 12/28/2023 | -- Water Design Plan | I-10 International Buildings 1, 2 & 3***VOID*** DUPLICATE-Resubmitted TW-WCP-0123-00045 |
Record Requests
Address: 4150 E LOS REALES RD
Date - 01/31/2025 5:04 a.m.
Total Number Of Requests - (5)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0224-01312 | Complete | 02/15/2024 | 03/15/2024 | Requests | TC-UTL-1122-00015 (4150 E LOS REALES RD TUCSON, AZ 85756) 2TC-UTL-1122-00015 (4150 E LOS REALES RD TUCSON, AZ 85756) TC-UTL-1122-00015 (4150 E LOS REALES RD TUCSON, AZ 85756) TC-UTL-1122-00015- 2nd extension request for the private sewer connection to the proposed buildings |
REQ-0823-04386 | Complete | 08/14/2023 | 09/08/2023 | Requests | Private sewer connection for 4 New Warehouse buildings |
REQ-0823-04400 | Approved | 08/14/2023 | 09/19/2023 | Requests | Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage. |
REQ-0824-05620 | Complete | 08/20/2024 | 08/21/2024 | Requests | Extension for the private sewer connection to the proposed buildings |
REQ-1224-08694 | Canceled | 12/23/2024 | N/A | Requests | Extension not needed, permit has not been issued. TC-FBB-0724-00141 Construction Trailer |