Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T22CM03955

Parcel: 14044004C

Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Permit Number - T22CM03955

Inspection Description - ENGR Engineering Final

Inspection Status - Partial Pass

Date Description Inspector Results Comments
08/15/2025 ENGR Engineering Final Partial Pass A TCO4 can be allowed for this building. There are no issues with the following that would prevent it from being issued,
Landscaping
Site function
Parking and striping
Access to site and buildings
Sidewalks and ramps
Drainage
ADA Compliance
09/11/2025 ENGR Engineering Final Partial Pass Elevation Certificates need to be submitted and accepted for Floodplain Use Permit. This is needed for full final and C O.

The building is good. Final touchups such as paint and work on awnings are currently being completed.

Some parking stalls to the east need to be striped. There is a van accessible sign that needs to go on ADA signage.
10/29/2025 ENGR Engineering Final Not Ready Recall Inspection after permit revision is completed.