Permit: T22CM03955

Parcel: 14044004C

Inspection Status: Partial Pass

Inspection History: COT - HCEL - Electrical Progress  

Date Description Inspector Results Comments
01/29/2025 COT - HCEL - Electrical Progress   Partial Pass 1/29/25: electrical underground per plans at SES location at west half of building 3. Ok to backfill.
07/09/2025 COT - HCEL - Electrical Progress   Partial Pass 7-9-25: SES ,panels , grounding/bonding on Building 2 verified per plans. Okay to continue with construction at progress areas. Also, total of 3 light pole cages were inspected. The light pole cage located in front of Building 2 on the far northwest side needs to have all loose dirt removed and reinspected by building and engineering,prior to pouring.
10/29/2025 COT - HCEL - Electrical Progress   Passed 10-29-25: approved.