Permit Details

Status:
C of o
Type:
MULTI FAMILY NEW
Apply Date:
01/15/2020
Applicant:
N/A
Description:
BENEDICTINE MONESTARY - BLDG 2
Contractors:
  • SUNDT CONSTRUCTION

Permit Reviews

Permit Number - T20CM00312
Permit Status: C of o
Permit Description: BENEDICTINE MONESTARY - BLDG 2
Start Date Submittal Complete Date Status  
01/15/2020 PLANS OK TO SUBMIT - COMM 01/24/2020 COMPLETED Review Details
01/24/2020 COMMERCIAL - NEW 04/07/2020 COMPLETED Review Details
04/07/2020 RESUBMITTAL - TI ALL 04/13/2020 COMPLETED Review Details
04/13/2020 RESUBMITTAL 05/04/2020 COMPLETED Review Details
05/04/2020 REVISION - - 1ST 05/26/2020 COMPLETED Review Details
05/18/2020 REVISION - - 2ND 05/26/2020 COMPLETED Review Details
07/22/2020 REVISION - - 3RD 08/04/2020 COMPLETED Review Details
10/15/2021 REVISION - - 5TH 11/04/2021 COMPLETED Review Details
11/16/2021 REVISION - - 5TH 11/30/2021 COMPLETED Review Details
12/30/2020 REVISION - - 4TH 03/26/2021 COMPLETED Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T20CM00312
Permit Description: BENEDICTINE MONESTARY - BLDG 2
Total Completed Inspections - 44
Date Description Inspector Results Comments
08/24/2020 PLUMBING - ROUGH, SOIL ESTEVENS Approved Not ready, not complete.
10/14/2020 BUILDING PRE-SLAB JBURGE Approved Partial: unscheduled inspection. Seattle Section, Level #2; Pour #4. Ok to place concrete in progress areas.
Charge Sundt APA account $165.00 for unscheduled inspection for inspection #01015.
11/05/2020 ELECTRIC - UNDERGROUND ESTEVENS Approved Partial. From southwest transformer to Green Bay electrical room.
11/17/2020 MECHANICAL - ABOVE CEILING ESTEVENS Approved Not ready.
12/01/2020 PLUMBING - GAS PRESSURE TEST ESTEVENS Approved Not ready.
12/01/2020 FRAMING ESTEVENS Approved Not ready.
12/03/2020 PLUMBING - ABOVE CEILING ESTEVENS Approved Partial. The breezeway between Green Bay and Cardinals sections.
12/03/2020 ELECTRIC - ABOVE CEILING ESTEVENS Approved Partial. The breezeway between Green Bay and Cardinals sections.
12/03/2020 BUILDING ABOVE CEILING ESTEVENS Approved Partial. The breezeway between Green Bay and Cardinals sections.
12/11/2020 PLUMBING - ROOF DRAINS ESTEVENS Approved Partial. Roof drains in units 2114, 2115, 2116.
12/15/2020 MECHANICAL - INTERMEDIATE ESTEVENS Approved Partial. building two. Dallas/ Broncos area. Level one. 2118 through 2124. Level two. 2220 through 2234.
12/18/2020 ROOF NAILING ESTEVENS Approved Partial. Cowboys/ Broncos lower section.
12/28/2020 PLUMBING - INTERMEDIATE JBURGE Approved Partial. Waste and vent lines; domestic water lines in Building #2; Level #2; Room Units 2216 - 2221.
12/29/2020 EXT METAL CLIPS/EXT SHEATHING ESTEVENS Approved Level 4. Densglass, Southeast corner to southwest corner.
12/29/2020 ELECTRIC - INTERMEDIATE ESTEVENS Approved Partial. Level 4, Broncos assembly deck. Level 2, storage rooms 212B, 212C, 212D.
12/29/2020 FIREWALL/FIREBARRIER/FIRESTOP ESTEVENS Approved Partial. Cowboys section. Level 2. Units 2219, 2218 ,2217, 2216, 2220, 2221, 2222.
04/29/2021 TEP CLEARANCE - PM ESTEVENS Approved CODE ECO/ Level 1. Units 2112 thru 2124. Level 2. Units 2214 thru 2234. Level 3. Units 2312 thru 2332. Level 4. Units 2420 thru 2437.
04/30/2021 ELECTRIC - CONSTRUCTION POWER ESTEVENS Approved PARTIAL FOR METERS FOR UNITS 2110 AND 2111
06/04/2021 ELECTRIC - UFER ESTEVENS Approved
06/04/2021 U VALUE FOR WINDOW ESTEVENS Approved
06/04/2021 STEM WALL/RETAINING WALL ESTEVENS Approved
11/30/2021 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved Approved. Pads for hydronic pumps at Southeast corner of parking area for Building #2. Ok to place concrete.
08/15/2022 FIRE - FINAL wmotto Approved
08/15/2022 FIRE - ALARM FINAL wmotto Approved
08/15/2022 FIRE SPKLR - FINAL wmotto Approved
08/16/2022 PLUMBING - YARD WTR LINE/TEST ESTEVENS Approved Approved
08/16/2022 PLUMBING - FINAL ESTEVENS Approved Approved
08/16/2022 ELECTRIC - OUTDOOR LIGHTING ESTEVENS Approved Approved
08/16/2022 ELECTRIC - FINAL ESTEVENS Approved Approved
08/16/2022 OUTDOOR LIGHTING FINAL ESTEVENS Approved Approved
08/16/2022 MECHANICAL - FINAL ESTEVENS Approved Approved
08/16/2022 SHEET ROCK NAILING ESTEVENS Approved Approved
08/16/2022 ENGINEERING - FINAL DROBERTS Approved DP19-0165 REMAINS OPEN FOR THE COMPLETIONOF T21CM00100, FENCE MATERIAL WILL REMAIN AROUND THE PARKING/PAAL AREA ON THE WEST SIDE OF THIS STRUCTURE.
09/02/2022 SITE - SEWER ESTEVENS Approved SEE 3005 CODE INSPECTIONS
09/02/2022 PLUMBING - SEWER HCS CONNECT ESTEVENS Approved SEE 3005 CODE INSPECTIONS
09/02/2022 MECHANICAL - HYDRONIC PIPING ESTEVENS Approved
09/02/2022 MECHANICAL - UNDERGROUND ESTEVENS Approved
09/02/2022 ELECTRIC - PROGRESS ESTEVENS Approved
09/02/2022 ELECTRIC - TEMPORARY SERVICE ESTEVENS Approved
09/02/2022 BUILDING - PROGRESS ESTEVENS Approved
09/02/2022 STUCCO MESH ESTEVENS Approved
09/02/2022 REINFORCED MASONRY PRE-GROUT ESTEVENS Approved
09/16/2022 CERTIFICATE OF OCCUPANCY JG3 Approved
09/16/2022 BUILDING - FINAL JG3 Approved