Permit: T20CM00312

Parcel: 12513068A

Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Date Description Inspector Results Comments
08/16/2022 BUILDING PRE-SLAB Approved Approved
10/14/2020 BUILDING PRE-SLAB Partial Approval Partial: unscheduled inspection. Seattle Section, Level #2; Pour #4. Ok to place concrete in progress areas.
Charge Sundt APA account $165.00 for unscheduled inspection for inspection #01015.
09/10/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 4, Broncos section, AA13 to AA20 and HH13 to HH20.

Patio slabs at W-12, W-15, W-17.
09/01/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 3 Broncos area. Within the gridlines of AA-13 to HH-13 and AA-20 to HH-20.
08/25/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension. AA-13 to AA-20 and JJ-13 to JJ-20.
08/20/2020 BUILDING PRE-SLAB Partial Approval Partial Level #1; Broncos Section. OK to place concrete in progress areas.
08/18/2020 BUILDING PRE-SLAB Partial Approval Partial. Post Tension Cable System at Building #3; Level #4; Section (Dallas Cowboys).
08/08/2020 BUILDING PRE-SLAB Partial Approval Partial. Level 3, post tension inspection with Jim B. Within the gridlines of MM to WW and 10.5 to 20.
07/30/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 2 within the gridlines FF.8-11.5 to FF.8-15 and WW-11.5 to WW-15.
07/21/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection with Jim B. Level 4 within the area of LL to WW and 6 thru 13.
07/13/2020 BUILDING PRE-SLAB Partial Approval Partial. On site inspection with JIm B. Post tension level 3. Within the area of gridline LL to WW and columns 6 to 13.
07/09/2020 BUILDING PRE-SLAB Cancelled Canceled by contractor
07/07/2020 BUILDING PRE-SLAB Partial Approval Partial. The area within HH to AA and 12 thru 20
07/02/2020 BUILDING PRE-SLAB Partial Approval Partial. Post tension inspection. Level 2 area, from grid line OO to WW and columns 6 to 12.5
06/25/2020 BUILDING PRE-SLAB Cancelled Canceled by contractor
06/24/2020 BUILDING PRE-SLAB Partial Approval Partial. Within the area grid lines of GG to WW and grid line 1 thru 7.
06/16/2020 BUILDING PRE-SLAB Partial Approval Partial. Gridline HH to WW and columns 12 to 20.
06/03/2020 BUILDING PRE-SLAB Not ready for Inspection Not ready.
05/20/2020 BUILDING PRE-SLAB Partial Approval Partial. Patio slabs on column 1-JJ and 1-SS, column 6-JJ.
05/19/2020 BUILDING PRE-SLAB Partial Approval Partial. From grid lines HH to WW and columns 1 thru 7.