Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
Permit Number - T20CM00312
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/16/2022 | BUILDING PRE-SLAB | Approved | Approved | |
| 10/14/2020 | BUILDING PRE-SLAB | Partial Approval | Partial: unscheduled inspection. Seattle Section, Level #2; Pour #4. Ok to place concrete in progress areas. Charge Sundt APA account $165.00 for unscheduled inspection for inspection #01015. |
|
| 09/10/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 4, Broncos section, AA13 to AA20 and HH13 to HH20. Patio slabs at W-12, W-15, W-17. |
|
| 09/01/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 3 Broncos area. Within the gridlines of AA-13 to HH-13 and AA-20 to HH-20. | |
| 08/25/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension. AA-13 to AA-20 and JJ-13 to JJ-20. | |
| 08/20/2020 | BUILDING PRE-SLAB | Partial Approval | Partial Level #1; Broncos Section. OK to place concrete in progress areas. | |
| 08/18/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post Tension Cable System at Building #3; Level #4; Section (Dallas Cowboys). | |
| 08/08/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Level 3, post tension inspection with Jim B. Within the gridlines of MM to WW and 10.5 to 20. | |
| 07/30/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 2 within the gridlines FF.8-11.5 to FF.8-15 and WW-11.5 to WW-15. | |
| 07/21/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection with Jim B. Level 4 within the area of LL to WW and 6 thru 13. | |
| 07/13/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. On site inspection with JIm B. Post tension level 3. Within the area of gridline LL to WW and columns 6 to 13. | |
| 07/09/2020 | BUILDING PRE-SLAB | Cancelled | Canceled by contractor | |
| 07/07/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. The area within HH to AA and 12 thru 20 | |
| 07/02/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Post tension inspection. Level 2 area, from grid line OO to WW and columns 6 to 12.5 | |
| 06/25/2020 | BUILDING PRE-SLAB | Cancelled | Canceled by contractor | |
| 06/24/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Within the area grid lines of GG to WW and grid line 1 thru 7. | |
| 06/16/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Gridline HH to WW and columns 12 to 20. | |
| 06/03/2020 | BUILDING PRE-SLAB | Not ready for Inspection | Not ready. | |
| 05/20/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. Patio slabs on column 1-JJ and 1-SS, column 6-JJ. | |
| 05/19/2020 | BUILDING PRE-SLAB | Partial Approval | Partial. From grid lines HH to WW and columns 1 thru 7. |