Permit: T20CM00312

Parcel: 12513068A

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T20CM00312

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
11/30/2021 EXCAVATION/LAYOUT REBAR & ZON Approved Approved. Pads for hydronic pumps at Southeast corner of parking area for Building #2. Ok to place concrete.
06/25/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Eleven columns on the southeast side for shade structure.
06/24/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. North side solar canopy columns in South side parking lot.
06/09/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Light poles on south east side of building.
05/18/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Rebar for 3 sets of light poles on south west corner of building.
10/29/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Delay strips, Level 4, between cowboys and Broncos.
10/13/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Patio slabs, Gridline L-8 thru 12 and P-14.
10/08/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval The delay strip beetween the Dallas and Broncos section, Level 2.
08/21/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Vertical rebar at gridlines GF-G5 to G6.
08/12/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor
08/08/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Level 3 columns at gridline MM-14, gridline NN- columns 11,12,16,18,20. Gridline WW-columns 11,12,13,15,17,19. Gridline QQ-columns 11,12,18,20. Gridline TT-columns 11,12,13,15,17,19. Shearwalls NN to SS-13 and SS-17 to 19 and elevator walls.
08/06/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor.
07/30/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Sheer wall at QQ-13, SS.5-14, and elevator.
07/13/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. On site inspection with JIm B. Post tension level 3. Within the area of gridline LL to WW and columns 6 to 13.
07/10/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor
07/09/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor
07/07/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. The area within HH to AA and 12 thru 20
07/06/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Not ready, not complete.
07/02/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection not ready, not complete.
07/01/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial.
06/30/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancel
06/25/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Canceled by contractor
06/24/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footing at GA-G8, GA-G5, GA-G3, GC-G2, GD-G2, GD-G3.
06/23/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Patios at KK-14, OO-12.
06/22/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1005. Footings at GC-G3, GA-G4, GB-D9, Columns at C-4, E-4, E-2, G-4.
06/19/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings at GB-G7, GB-G6, GB-G3. Columns at H-8, H-7, H-5, F-5, F-8.
06/18/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled
06/17/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled
06/12/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancelled by contractor.
06/05/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Patio slabs on on gridline WW- columns 8, 9, & 11.
06/04/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Patio rebar at gridline OO-columns 8, 9, 11.
06/03/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at column 13-FF thru GG
06/01/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Building # 2; Placement #2. Ok to place concrete in progress areas.
05/29/2020 EXCAVATION/LAYOUT REBAR & ZON Cancelled Cancelled by contractor
05/27/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings at HH-14, FF-14.
05/22/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at AA-18, AA-16, AA-14.
05/21/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Porch slab at W-4.
05/20/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at CC-14, CC-16, CC-18, CC-20, BB-18, BB-20, AA-20.
05/19/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at GG-20, FF-20, EE-20, DD-20.
05/15/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Columns at TT-16, TT-17, OO-16, KK-18, II-16, KK-20.
Wall section BB 13 thru 16.
05/14/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Stem wall for stairwell on north side, grid line HH 1.5 thru 1005.

Columns at II-18, II-20, FF-16, EE-16, EE-18.
05/13/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings on gridlines 14-JJ, 16-JJ, 20-KK. Columns on gridlines 18-FF, 18-HH, 16-HH, 16-KK, 14-KK, 14-MM
05/05/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval RVI Rebar and electric in shearwall #2.