Permit Details

Status:
Final
Type:
COMMERCIAL NEW
Address:
280 S CHURCH AV
Address NEW:
280 S CHURCH AV
Apply Date:
04/02/2019
Applicant:
TIM SMITH
Description:
E- FOUNDATION AND SUPER STRUCTURE
Architects:
  • MARLEY, EDWARD TODD
Contractors:
  • RYAN COMPANIES U S INC

Permit Reviews

Permit Number - T19CM02310
Permit Status: Final
Permit Description: E- FOUNDATION AND SUPER STRUCTURE
Start Date Submittal Complete Date Status  
04/02/2019 COMMERCIAL - NEW 05/07/2019 COMPLETED Review Details
05/07/2019 RESUBMITTAL 09/18/2019 COMPLETED Review Details
09/30/2019 REVISION - - 1ST 10/09/2019 COMPLETED Review Details
10/09/2019 REVISION - - 2ND 10/11/2019 COMPLETED Review Details
10/25/2019 REVISION - - 3RD 11/12/2019 COMPLETED Review Details
11/12/2019 REVISION - - 4TH 11/14/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM02310
Permit Status: Final
Permit Description: E- FOUNDATION AND SUPER STRUCTURE
Total Outstanding Activity Conditions - 1
Date Name
04/02/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T19CM02310
Permit Description: E- FOUNDATION AND SUPER STRUCTURE
Total Completed Inspections - 15
Date Description Inspector Results Comments
10/31/2019 BUILDING - PROGRESS JBURGE Approved Review Man-lift foundation plans.
11/14/2019 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved Level #2; Elevator shear walls; concrete columns at GL: A/6; B/11; D/5; D/6; D/9; D/13; G/5; G/6. Ok to place concrete in Progress areas.
11/18/2019 BUILDING PRE-SLAB JBURGE Approved Post Tension Cable System at Level #2; slab #242; GL: A-H/4.8-7. Ok to place concrete in progress areas.
12/05/2019 STEM WALL/RETAINING WALL JBURGE Approved Stem walls for west HVAC vault. Ok to place concrete in progress area.
12/31/2019 REINFORCED MASONRY PRE-GROUT JBURGE Approved CMU walls at 0'-4' at GL: K.5/14.5-13.8; 14.5/K.8-K; K/14.5-12. Ok to grout progress areas.
06/24/2020 FRAMING JBURGE Approved SEE 1090
06/24/2020 SHEET ROCK NAILING JBURGE Approved SEE 1090
10/16/2020 ELECTRIC - UNDERGROUND JBURGE Approved per 1090
10/16/2020 PLUMBING - INTERMEDIATE JBURGE Approved per 1090
10/16/2020 PLUMBING - ROUGH, SOIL JBURGE Approved per 1090
10/16/2020 BUILDING - FINAL JBURGE Approved Approved
11/06/2020 ELECTRIC - INTERMEDIATE JBURGE Approved Partial. VRI Inspection. Transformer linked and energized to building electric systems. TEP performed power link for energizing system. Called in to TEP (Marcia) at 1525 hours
11/20/2020 ENGINEERING - FINAL BBENEDON Approved Not ready. Provide separation from ongoing construction, and save access for non-construction personnel to obtain permission for a temporary certificate. Ray with Ryan.
11/20/2020 ENGINEERING - FINAL BBENENDON Approved Not ready. Provide separation from ongoing construction, and save access for non-construction personnel to obtain permission for a temporary certificate. Ray with Ryan.
11/20/2020 ENGINEERING - FINAL BBENEDON Approved Not ready. Provide separation from ongoing construction, and save access for non-construction personnel to obtain permission for a temporary certificate. Ray with Ryan.