Permit: T19CM02310

Parcel: 11720029A


Addresses:

280 S CHURCH AV

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
10/16/2020 PLUMBING - ROUGH, SOIL Approved per 1090
02/05/2020 PLUMBING - ROUGH, SOIL Partial Approval Grease trap, water tested. Ok to back fill, compact, slurry.
10/03/2019 PLUMBING - ROUGH, SOIL Partial Approval Waste lines from bathroom to East exterior wall 4"-6"; at GL: B/2-5. Ok to cover progress.
10/01/2019 PLUMBING - ROUGH, SOIL Partial Approval Waste and vent lines to Bar Room #041 at 2"-4": GL: H/6. Ok to cover progress areas.
09/30/2019 PLUMBING - ROUGH, SOIL Partial Approval Public restrooms waste and vent lines at 2 1/2" - 6" ; all lines under hydro test. Roof drains at West side of structure at 4"; all lines are under hydro testing.
09/24/2019 PLUMBING - ROUGH, SOIL Partial Approval Beer and soda lines to Bar area and Bar storage.
09/20/2019 PLUMBING - ROUGH, SOIL Partial Approval North portion of site GL: F-M/14-8; waste and vent lines (2 1/2”-6” lines. Ok to cover progress areas.
09/10/2019 PLUMBING - ROUGH, SOIL Partial Approval Waste lines( sanitary lines and grease lines). 2"-6" at GL: E-A/6-14. Ok to cover progress areas..