Date Description Inspector Results Comments
06/24/2020 REINFORCED MASONRY PRE-GROUT Approved Approved
03/20/2020 REINFORCED MASONRY PRE-GROUT Partial Approval CMU site walls (South); topped out at 8'; except for wall at GL: 14/A-C
RVI
01/03/2020 REINFORCED MASONRY PRE-GROUT Partial Approval CMU walls at 4'-8'; GL: K.5/13.8-14.5; 14.5/K-K.8; K/12-14.5. Ok to place grout in progress areas.
12/31/2019 REINFORCED MASONRY PRE-GROUT Partial Approval CMU walls at 0'-4' at GL: K.5/14.5-13.8; 14.5/K.8-K; K/14.5-12. Ok to grout progress areas.
12/17/2019 REINFORCED MASONRY PRE-GROUT Partial Approval CMU North wall at GL: M/10-12 at 8'-12'. Ok to place grout.
10/22/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Partial. CMU wall at stairwell #1, West side at 0”-48”; Stairwell #2, South side wall at 8’-12’. Ok to place grout in progress areas.
10/11/2019 REINFORCED MASONRY PRE-GROUT Partial Approval West ramp stem wall at 16"-32"; Southeast stair well wall at 0-48"; Northwest stem wall at 0-48". Ok to place grout in progress areas.
09/27/2019 REINFORCED MASONRY PRE-GROUT Partial Approval CMU columns at GL: 112/2.5; 112/3; 112/3.75; 112/4.25; 112/5; 112/7.25. Ok to place grout at progress areas.
09/25/2019 REINFORCED MASONRY PRE-GROUT Cancelled Canceled due to rain.
09/24/2019 REINFORCED MASONRY PRE-GROUT Not ready for Inspection Rained out.
09/23/2019 REINFORCED MASONRY PRE-GROUT Partial Approval CMU Columns at GL: 112/7.25 and 112/2.5 at 4’-8’; 112/5; 112/4.25; 112/3.75; 112/3 at 6’-10’. Ok to place grout in progress areas.
09/20/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Columns at GL: 112/7.25; 112/5; 112/4.25; 112/3.75; 112/3; 112/2.5 all at 4’-8’. Ok to place concrete grout in progress areas.