Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T19CM02310
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/28/2021 | ENGINEERING - FINAL | Approved | ALL OTHER INSPECTIONS COMPLETED | |
01/19/2021 | ENGINEERING - FINAL | Partial Approval | OK FOR TCO FOR OCCUPANCY PENDING ALL OTHER INSPECTIONS | |
01/14/2021 | ENGINEERING - FINAL | Partial Approval | PARTIAL, NOT READY FOR FINAL INSPECTION | |
01/13/2021 | ENGINEERING - FINAL | Partial Approval | PARTIAL SCHEDULE RE-INSPECTION FOR TOMORROW. | |
11/20/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Provide separation from ongoing construction, and save access for non-construction personnel to obtain permission for a temporary certificate. Ray with Ryan. | |
11/20/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Provide separation from ongoing construction, and save access for non-construction personnel to obtain permission for a temporary certificate. Ray with Ryan. | |
11/20/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Provide separation from ongoing construction, and save access for non-construction personnel to obtain permission for a temporary certificate. Ray with Ryan. |