Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18CM08485
Permit Details
Apply Date:
10/24/2018
Applicant:
TARVER JONES
Description:
NEW MICRO HOSPITAL
Contractors:
- ADOLFSON AND PETERSON CONSTRUCTION *C
Permit Reviews
Permit Number - T18CM08485
Permit Status: C of o
Permit Description: NEW MICRO HOSPITAL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/28/2019 | RESUBMITTAL | 05/01/2019 | COMPLETED |
05/01/2019 | RESUBMITTAL | 05/20/2019 | COMPLETED |
10/24/2018 | PLANS OK TO SUBMIT - COMM | 10/24/2018 | COMPLETED |
10/24/2018 | COMMERCIAL - NEW | 12/20/2018 | COMPLETED |
12/21/2018 | RESUBMITTAL | 02/28/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM08485
Permit Status: C of o
Permit Description: NEW MICRO HOSPITAL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/24/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T18CM08485
Permit Description: NEW MICRO HOSPITAL
Total Completed Inspections - 56
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2019 | PLUMBING - ROUGH, SOIL | AKEINSORGE | Approved | Area A, ok to backfill. Also all corrections in Area B from inspection on 07/12/19 have been done and are acceptable. THIS WAS A SAME DAY INSPECTION. $165 FEE HAS BEEN ASSESSED, BUT NOT YET PAID. |
08/14/2019 | ELECTRIC - UFER | AKLEINSORGE | Approved | 20’ of copper #4 tied to thickened footing on east side of building in a Area B |
10/02/2019 | BUILDING PRE-SLAB | DMUNIZ | Approved | ok for concrete placement around steel columns for area A. |
10/04/2019 | PLUMBING - YARD WTR LINE/TEST | DMUNIZ | Approved | Pressure test for 2-3" copper risers ok. |
11/12/2019 | PLUMBING - PRE SLAB | TVALENCIA | Approved | 1- Water service piping from Riser room to backflow preventers is okay to cover. |
11/13/2019 | PLUMBING - ROOF DRAINS | DMUNIZ | Approved | 9 sets of Primary and Secondary Roof drains under test and Approved. |
11/18/2019 | PLUMBING - SEWER HCS CONNECT | CTREVIL | Approved | DO NOT FINAL SEWER CONNECTION UNTIL RWRD FEES HAVE BEEN PAID. |
11/21/2019 | SITE - SEWER | DMUNIZ | Approved | Inspection for continuation of Sewer from first clean-out to second Clean out and beyond 40’ Tracer installed and clean fill provided ok to backfill. |
11/22/2019 | PLUMBING - ABOVE CEILING | DMUNIZ | Approved | cast iron Vent system for Area B under test and Approved, stopped inspection at GL J.0. |
12/02/2019 | EXCAVATION/LAYOUT REBAR & ZON | TVALENCIA | Approved | 1- Steel reinforcement is okay for concrete in X-Ray and CT room only. |
12/04/2019 | ROOF NAILING | DMUNIZ | Approved | Exterior Ramada roof decking ok for West, & South entrance. |
12/11/2019 | MECHANICAL - PROGRESS | DMUNIZ | Approved | Inspection for Hi and Low Pressure Ductwork in Area B multiple corrections disclosed to contractor, will call in inspection for above ceiling once completed. |
12/18/2019 | ELECTRIC - UNDERGROUND | DMUNIZ | Approved | Electrical Conduits for 6 of 8 Exterior light poles ok to shade, tape & backfill. |
12/18/2019 | SHEET ROCK NAILING | DMUNIZ | Approved | progress Area B. |
12/18/2019 | EXT METAL CLIPS/EXT SHEATHING | DMUNIZ | Approved | Exterior Sheathing front entry. |
12/20/2019 | PLUMBING - MEDICAL GAS/TEST | DMUNIZ | Approved | Med Gas Area A & B. |
12/23/2019 | MECHANICAL - INTERMEDIATE | DMUNIZ | Approved | Area A ok to test and insulate ducts. |
12/23/2019 | PLUMBING - INTERMEDIATE | DMUNIZ | Approved | no inspection done at this time. |
12/23/2019 | ELECTRIC - ABOVE CEILING | DMUNIZ | Approved | North East Electrical in ceiling ok. |
12/23/2019 | FIREWALL/FIREBARRIER/FIRESTOP | DMUNIZ | Approved | area B Top of Fire assemblies ok. |
12/23/2019 | STUCCO MESH | DMUNIZ | Approved | |
12/23/2019 | FRAMING | DMUNIZ | Approved | no inspection at this time. |
12/27/2019 | ELECTRIC - INTERMEDIATE | DMUNIZ | Approved | Area A CT, X-Ray, and exam rooms Electrical in walls ok. |
01/06/2020 | PLUMBING - GAS PRESSURE TEST | DMUNIZ | Approved | Gas Pressure test for 2" Line from Exterior to location of 2 Water Heaters ok. |
02/05/2020 | TEP CLEARANCE - PM | DMUNIZ | Approved | CODE ECO |
02/07/2020 | BUILDING - TEMP POWER FOR TEST | DMUNIZ | Approved | |
02/07/2020 | ELECTRIC - TEMPORARY SERVICE | DMUNIZ | Approved | |
02/07/2020 | PLUMBING - MD GAS/PRECONST MTG | DMUNIZ | Approved | |
02/28/2020 | PLUMBING - BACK WATER VALVE | DMUNIZ | Approved | |
02/28/2020 | ELECTRIC - CABLE DROP | DMUNIZ | Approved | |
02/28/2020 | ELECTRIC - SERVICE UPGRADE | DMUNIZ | Approved | |
03/03/2020 | U VALUE FOR WINDOW | DMUNIZ | Approved | U value details per plan inspected and Approved. |
03/05/2020 | PLUMBING - PROGRESS | DMUNIZ | Approved | |
03/05/2020 | ELECTRIC - OUTDOOR LIGHTING | DMUNIZ | Approved | |
03/05/2020 | REINFORCED MASONRY PRE-GROUT | DMUNIZ | Approved | |
03/05/2020 | STEM WALL/RETAINING WALL | DMUNIZ | Approved | |
03/24/2020 | OUTDOOR LIGHTING FINAL | DMUNIZ | Approved | |
04/03/2020 | PLUMBING - GAS PRESS TEST FNL | TVALENCIA | Approved | Clear gas meter |
04/03/2020 | MECHANICAL - ABOVE CEILING | TVALENCIA | Approved | |
04/03/2020 | BUILDING ABOVE CEILING | TVALENCIA | Approved | |
04/06/2020 | GAS CLEARANCE | TVALENCIA | Approved | CODE |
04/16/2020 | BUILDING - PROGRESS | TTREMBLAK | Approved | RVI |
04/23/2020 | PLUMBING - MEDICAL GAS/FINAL | TTREMBULAK | Approved | RVI Cancelled by contractor. Will reschedule after 3rd party inspection |
05/04/2020 | ZONING - FINAL | RLEDONNE | Approved | OK to approve per Steve shields Land split has been completed. |
05/08/2020 | ELECTRIC - FINAL | DMUNIZ | Approved | |
05/12/2020 | LANDSCAPE - FINAL | RLEDONNE | Approved | |
05/12/2020 | SIGN - FINAL | RLEDONNE | Approved | |
05/12/2020 | NPPO - FINAL | RLEDONNE | Approved | |
05/13/2020 | ENGINEERING - FINAL | RLEDONNE | Approved | |
05/15/2020 | PLUMBING - FINAL | DMUNIZ | Approved | |
05/20/2020 | FIRE SPKLR - FINAL | jvincent | Approved | |
06/05/2020 | MECHANICAL - FINAL | DMUNIZ | Approved | |
06/05/2020 | RIGHT OF WAY - FINAL | BMONG | Approved | ALL WORK IN THE ROW IS WITHIN SPECIFCATIONS |
06/09/2020 | BUILDING - FINAL | JG3 | Approved | |
06/09/2020 | FIRE - FINAL | jvincent | Approved | |
06/09/2020 | FIRE - ALARM FINAL | jvincent | Approved |