Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date |
Description |
Inspector |
Results |
Comments |
| 03/05/2020 |
REINFORCED MASONRY PRE-GROUT |
|
Approved |
|
| 02/28/2020 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
CMU wall for generator 2nd lift ok for grout. |
| 02/27/2020 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
Vertical rebar for second lift on Generator CMU Inspected. |
| 02/26/2020 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
Generator room OK to grout to 5’4" approximately, Bond beams every 32 inches |
| 01/16/2020 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
first lift for Generator & trash stem walls ok to grout. |
| 01/15/2020 |
REINFORCED MASONRY PRE-GROUT |
|
Not ready for Inspection |
Contractor cancelled via phone call. |