Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T18CM08485
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/05/2020 | REINFORCED MASONRY PRE-GROUT | Approved | ||
02/28/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CMU wall for generator 2nd lift ok for grout. | |
02/27/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Vertical rebar for second lift on Generator CMU Inspected. | |
02/26/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Generator room OK to grout to 5’4" approximately, Bond beams every 32 inches | |
01/16/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | first lift for Generator & trash stem walls ok to grout. | |
01/15/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Contractor cancelled via phone call. |