| 02/07/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
|
| 01/23/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Re bar placement for generator & trash enclosure ok for concrete placement. |
| 01/16/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
|
| 01/15/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
Contractor cancelled via phone call. |
| 01/13/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
case ons for light poles ok for concrete placement. |
| 01/09/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Cancelled |
Inspection cancel by contractor |
| 01/08/2020 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Generator footing ok for concrete placement, stem wall verticals in place. |
| 12/02/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
1- Steel reinforcement is okay for concrete in X-Ray and CT room only. |
| 11/12/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
1- Steel reinforcement for trash enclosure is okay. |
| 11/04/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Steel reinforcement for front entrance vestibule (C.0-D.0/3.8-4.6) and front Exterior column block outs (A.0-B.0/4.1-4.3). Ok for concrete placement, third party inspection Approved as well. |
| 10/17/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Yard storage and Riser room ok for concrete placement, third party onsite for special inspection and Approved. |
| 10/08/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Pads on Roof deck steel in place, ok for concrete placement. |
| 09/30/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
Contractor rescheduled upon arrival |
| 09/27/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Stem wall/ steel column surround NE corner ok for concrete placement. Third party inspection Approved. |
| 08/21/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Area A: monolithic pour between Grids D to J/1 to 7, excluding Rooms 135, 136, 137, and 140 |
| 07/15/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Inspected epoxy anchor bolts for footings (RFI #8) at the following locations: Grids P.0/3.0, M.0/3.0, P.0/4.2, K.0/3.0, F.0/2.0, F.0/6.0, G.0/7.0 and H.0/7.0, special inspection was preformed by Speedie and Associates during the placement of anchor bolts |
| 06/27/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
work incomplete upon arrival. |
| 06/25/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
completion Of column footings (F.0/1.8-2.0, A.0/4.1, A.0/4.3, B.0/4.2) Approved and ok to pour. |
| 06/24/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
All interior column footings and exterior perimeter column footings for south and west side of building, ok for concrete placement |