Permit Details

Status:
C of o
Type:
MULTI FAMILY NEW
Address NEW:
855 W CONGRESS ST
Apply Date:
03/16/2017
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
NEW APARTMENT BLDG
Contractors:
  • TOFEL CONSTRUCTION LLC

Permit Reviews

Permit Number - T17CM02114
Permit Status: C of o
Permit Description: NEW APARTMENT BLDG
Start Date Submittal Complete Date Status  
03/16/2017 PLANS OK TO SUBMIT - COMM 03/16/2017 COMPLETED Review Details
03/16/2017 3RD PARTY REVIEW - COMMERCIAL 05/25/2017 COMPLETED Review Details
04/13/2018 3RD PARTY REVIEW - REVISION/OTHER 06/07/2018 COMPLETED Review Details
05/25/2017 3RD PARTY REVIEW - COMMERCIAL 07/11/2017 COMPLETED Review Details
06/04/2018 3RD PARTY REVIEW - REVISION/OTHER 11/30/2018 COMPLETED Review Details
07/27/2017 REVISION - - 1ST 07/28/2017 COMPLETED Review Details
09/07/2017 3RD PARTY REVIEW - REVISION/OTHER 09/15/2017 COMPLETED Review Details
11/29/2017 3RD PARTY REVIEW - REVISION/OTHER 04/05/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T17CM02114
Permit Status: C of o
Permit Description: NEW APARTMENT BLDG
Total Outstanding Activity Conditions - 1
Date Name
03/16/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T17CM02114
Permit Description: NEW APARTMENT BLDG
Total Completed Inspections - 46
Date Description Inspector Results Comments
12/12/2017 PLUMBING - PRE SLAB RCAMACHO Approved AFTER HOURS
RECEIVED CHECK # 024272 $165.00
2ND HALF OF DECK POUR
12/21/2017 ELECTRIC - UNDERGROUND RCAMACHO Approved LAST ENTRY 2017
5 EACH SECONDARIES CONDUIT FROM TRANSFORMER TO MPC
3 EACH 2 1/2" CONDUIT FROM SCSHP TO DECK SLAB
5 EACH 4" CONDUIT SECONDARIES FROM TRANSFORMER TO MPB
06/07/2018 ROOF NAILING RCAMACHO Approved
06/07/2018 PLUMBING - SEWER HCS CONNECT RCAMACHO Approved
08/27/2018 PLUMBING - ROOF DRAINS RCAMACH1 Approved IVRS - Inspection :*
09/05/2018 EXT METAL CLIPS/EXT SHEATHING RCAMACHO Approved
09/07/2018 REINFORCED MASONRY PRE-GROUT RCAMACHO Approved
10/24/2018 MECHANICAL - INTERMEDIATE RCAMACHO Approved
10/24/2018 ELECTRIC - INTERMEDIATE RCAMACHO Approved
10/24/2018 FRAMING RCAMACHO Approved
10/24/2018 STEM WALL/RETAINING WALL RCAMACHO Approved NE retaining wall per detail ssk2
10/30/2018 STUCCO MESH RCAMACHO Approved
11/01/2018 ELECTRIC - TEMPORARY SERVICE RCAMACHO Approved ECO
ok to energize switchgear for test
To remain locked out and tagged out
11/01/2018 ELECTRIC - CABLE DROP RCAMACHO Approved ECO
ok to energize switchgear for test
To remain locked out and tagged out
11/29/2018 SIGN - FINAL bbenedo1 Approved
11/29/2018 FIRE SPKLR - FINAL JPEELDAVIS Approved Room 111 closets have a total of 3 heads that are twisted
Room 111 bathroom has a head that needs to be replaced
Room 110 Kitchen area has a head that needs to be tweaked
Room 110 has a head in the bathroom that needs to be adjusted
Mechanical room on the 1st floor east area needs to have a head added because it is covered with drywall
Room 113 bedroom areas have 2 heads that need to be corrected
Room 113 has a head in the closet that has tape on it and needs an escutcheon added
Room 113 hallway head is painted and needs to be replaced
Room 115 bathroom head needs to be adjusted/ replaced
Room 104 has a painted head in the bathroom
Room 105 laundry room has a painted head
Room 107 head painted in the kitchen that also needs to be lowered since it is obstructed by the light fixture
Room 107 painted heads in the laundry and bathroom areas
Room 116 hall head needs to be corrected
Room 116 closet and hall heads are painted
Add head in the fire riser room
Add heads under the garage door in the basement
Add head in the mutli purpose room
Remove two heads in the hall outside of the offices
Rotate all hose connection so that they are not pointing in the down position.
The bike room has two heads that are painted
Need to extend the stanpipes to the roof for access
This was for the first floor only
11/29/2018 RIGHT OF WAY - FINAL cfarren Approved contractor would like to keep temp fence up for the project while they finish up landscaping for safety which will have to removed before final. they still have some scuppers to install in the sidewalk and will get another ROW permit to due those installs. they also have one panel of sidewalk that needs to be removed due to not being compliant on south ramp on the east side of the project along with patching a few chips in existing sidewalk. all of this will be done during scupper install,
11/29/2018 NPPO - FINAL BBENEDON Approved
11/30/2018 STORMWATER FOLLOW-UP INSP BBENEDON Approved Secure fence netting that has come loose along North perimeter. Clean mud from the sidewalks. Remove debris that is staged outside of the fenced area.
11/30/2018 LANDSCAPE - FINAL BBENEDON Approved Complete Landscaping shown on development package, plants and trees missing, 4 in Basin around tree Wells required, provide staking. Contractor has not yet installed DG.
11/30/2018 ENGINEERING - FINAL BBENEDON Approved Engineering has no issues preventing TCO.
11/30/2018 OUTDOOR LIGHTING FINAL MRAMBER Approved Ok pending Armondo Q. approval
11/30/2018 ELECTRIC - OUTDOOR LIGHTING MRAMBER Approved
11/30/2018 LANDSCAPE - FINAL bbenedo1 Approved Work is in progress.
12/18/2018 MECHANICAL - ABOVE CEILING IVR USER Approved IVRS - AP canceled
12/18/2018 PLUMBING - INTERMEDIATE IVR USER Approved IVRS - AP canceled
12/18/2018 PLUMBING - ROUGH, SOIL IVR USER Approved IVRS - AP canceled
12/18/2018 ZONING - FINAL RSALDAT Approved On site inspection found that building elevations do not meet the IID concept drawings.
12/19/2018 SITE - SEWER ESTEVENS Approved
12/19/2018 PLUMBING - YARD WTR LINE/TEST ESTEVENS Approved
12/19/2018 PLUMBING - ABOVE CEILING ESTEVENS Approved
12/19/2018 ELECTRIC - ABOVE CEILING ESTEVENS Approved
12/19/2018 ELECTRIC - UFER ESTEVENS Approved
12/19/2018 SHEET ROCK NAILING ESTEVENS Approved
12/19/2018 U VALUE FOR WINDOW ESTEVENS Approved
12/19/2018 BUILDING ABOVE CEILING ESTEVENS Approved
12/19/2018 EXCAVATION/LAYOUT REBAR & ZON RCAMACHO Approved
12/19/2018 BUILDING PRE-SLAB ESTEVENS Approved
12/27/2018 TEP CLEARANCE - AM RCAMACHO Approved ECO
12/28/2018 FIRE - FINAL jvincent Approved APPROVED TO OBTAIN TCO FOR 3RD FLOOR.
12/28/2018 FIRE - FINAL JPEELDAVIS Approved OK FOR TCO 3RD FLOOR
12/28/2018 MECHANICAL - FINAL RCAMACHO Approved Terminate condensate lines
terminate TPR lines
secure dishwasher drain lines highest point
anti-tilt stoves
labels circuits
seal opening sub panels
except unit 302 not complete
ok To apply for temporary CEO units 301, 303–319 only
pending engineering and fire
12/28/2018 PLUMBING - FINAL RCAMACHO Approved Terminate condensate lines
terminate TPR lines
secure dishwasher drain lines highest point
anti-tilt stoves
labels circuits
seal opening sub panels
except unit 302 not complete
ok To apply for temporary CEO units 301, 303–319 only
pending engineering and fire
12/28/2018 ELECTRIC - FINAL RCAMACHO Approved Terminate condensate lines
terminate TPR lines
secure dishwasher drain lines highest point
anti-tilt stoves
labels circuits
seal opening sub panels
except unit 302 not complete
ok To apply for temporary CEO units 301, 303–319 only
pending engineering and fire
12/28/2018 BUILDING - FINAL RCAMACHO Approved Terminate condensate lines
terminate TPR lines
secure dishwasher drain lines highest point
anti-tilt stoves
labels circuits
seal opening sub panels
except unit 302 not complete
ok To apply for temporary CEO units 301, 303–319 only
pending engineering and fire
01/24/2019 FIRE - ALARM FINAL gsereno1 Approved