Permit: T17CM00673
Permit Details
Apply Date:
01/26/2017
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
NEW SHELL BLDG
Architects:
- SAYLER-BROWN, THOMAS
Contractors:
- CANYON BUILDING AND DESIGN LLC *APA*
Permit Reviews
Permit Number - T17CM00673
Permit Status: L of c
Permit Description: NEW SHELL BLDG
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/02/2018 | REVISION - - 5TH | 01/04/2018 | COMPLETED |
01/16/2018 | REVISION - - 6TH | 01/17/2018 | COMPLETED |
01/17/2018 | REVISION - - 6TH | 01/25/2018 | COMPLETED |
01/25/2018 | REVISION - - 6TH | 02/01/2018 | COMPLETED |
01/26/2017 | PLANS OK TO SUBMIT - COMM | 01/26/2017 | COMPLETED |
01/26/2017 | COMMERCIAL - NEW | 03/02/2017 | COMPLETED |
02/02/2018 | REVISION - - 6TH | 02/02/2018 | COMPLETED |
02/06/2018 | REVISION - - 7TH | 02/28/2018 | COMPLETED |
02/28/2018 | REVISION - - 8TH | 03/08/2018 | COMPLETED |
03/02/2017 | RESUBMITTAL | 03/23/2017 | COMPLETED |
03/23/2017 | RESUBMITTAL | 04/04/2017 | COMPLETED |
04/04/2017 | RESUBMITTAL | 04/25/2017 | COMPLETED |
04/25/2017 | REVISION - - 1ST | 04/27/2017 | COMPLETED |
05/16/2017 | REVISION - - 2ND | 05/19/2017 | COMPLETED |
05/19/2017 | WALK THRU - COMM | 05/19/2017 | COMPLETED |
05/19/2017 | OTHER | 05/23/2017 | COMPLETED |
06/28/2017 | REVISION - - 3RD | 07/06/2017 | COMPLETED |
07/30/2018 | REVISION - - 9TH | 07/31/2018 | COMPLETED |
10/25/2017 | REVISION - - 4TH | 10/27/2017 | COMPLETED |
11/29/2018 | REVISION - 10TH | 11/29/2018 | COMPLETED |
12/19/2017 | REVISION - - 5TH | 12/22/2017 | COMPLETED |
12/31/2018 | REVISION - 10TH | 01/03/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM00673
Permit Status: L of c
Permit Description: NEW SHELL BLDG
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/26/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: L of c
Permit Number: T17CM00673
Permit Description: NEW SHELL BLDG
Total Completed Inspections - 45
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/24/2017 | ELECTRIC - PROGRESS | mramber1 | Approved | columns D.7/4 , C/6 1st level ok |
06/15/2017 | PLUMBING - YARD WTR LINE/TEST | mramber1 | Approved | ok along west sie of bldg |
08/18/2017 | STEM WALL/RETAINING WALL | AQUIROZ | Approved | 10 COLUMES AT 3RD FLOOR SOUTHWEST CORNER |
10/27/2017 | ELECTRIC - UFER | mramber1 | Approved | UG at fire pump ok |
11/22/2017 | BUILDING PRE-SLAB | mramber1 | Approved | north and south elevator shafts, south stairway |
11/22/2017 | ELECTRIC - UNDERGROUND | mramber1 | Approved | at transformer |
12/07/2017 | REINFORCED MASONRY PRE-GROUT | mramber1 | Approved | top out at pump room ok |
12/08/2017 | ELECTRIC - INTERMEDIATE | mramber1 | Approved | met with contractor |
12/08/2017 | MECHANICAL - ABOVE CEILING | mramber1 | Approved | met with contractor |
12/08/2017 | PLUMBING - INTERMEDIATE | mramber1 | Approved | met with contractor |
02/16/2018 | PLUMBING - BACK WATER VALVE | mramber1 | Approved | cancelled per contractor |
03/09/2018 | PLUMBING - ABOVE CEILING | mramber1 | Approved | domestic 1 thru 4 ok |
04/10/2018 | ROOF NAILING | mramber1 | Approved | |
04/10/2018 | U VALUE FOR WINDOW | mramber1 | Approved | north wall |
04/19/2018 | ELECTRIC - TEMPORARY SERVICE | mramber1 | Approved | |
05/04/2018 | TEP CLEARANCE - AM | CAMACHO | Approved | INCR |
05/04/2018 | ELECTRIC - CONSTRUCTION POWER | RCAMACHO | Approved | OK TO ENERGIZE SUBPANELS LEVELS 3 AND 4 PROVIDE LETTER OF TORQUE |
05/16/2018 | PLUMBING - ROOF DRAINS | mramber1 | Approved | |
05/29/2018 | EXT METAL CLIPS/EXT SHEATHING | mramber1 | Approved | 4th and 5th floor north exterior sheathing ok |
06/27/2018 | ZONING - FINAL | DROBERTS | Approved | IT IS UNCLEAR AT THIS TIME WHAT THIS ZONING FINAL IS SUPPOSE TO CHECK. I WILL FIND OUT THIS INFORMATION OF THE ZONING REVIEWER AND THEN WILL REINSPECT THIS SITE . |
06/28/2018 | PLUMBING - GAS PRESSURE TEST | mramber1 | Approved | |
06/29/2018 | ENGINEERING - FINAL | DROBERTS | Approved | OK FOR THE TCO IF THE SITE REMAINS SEPERATED FROM CONSTRUCTION AND PEDESTRIAN. MINOR ADJUSTMENTS NEED TO BE MADE BY THE END OF THE DAY TO ACHIEVE THE TEMPORARY CERTIFICATE OF OCCUPANCY |
06/29/2018 | RIGHT OF WAY - FINAL | DR | Approved | Partial approval. No Final approval until ROW work complete. |
08/13/2018 | BUILDING - PROGRESS | RCAMACHO | Approved | WALKED ENTIRE JOB ALL 5 FLOORS NO SUPER FOUND ON SITE. SHEETROCK NAILING PUMP HOUSE FIRE WALLS NORTH WALLS OF ELEVATOR 2ND AND 5TH FLOORS ONLY |
08/13/2018 | SHEET ROCK NAILING | RCAMACHO | Approved | WALKED ENTIRE JOB ALL 5 FLOORS NO SUPER FOUND ON SITE. SHEETROCK NAILING PUMP HOUSE FIRE WALLS NORTH WALLS OF ELEVATOR 2ND AND 5TH FLOORS ONLY |
08/17/2018 | PLUMBING - ROUGH, SOIL | mramber1 | Approved | DWV and Dom at east stairwell mop sink ok |
08/17/2018 | ELECTRIC - ABOVE CEILING | mramber1 | Approved | |
08/27/2018 | MECHANICAL - INTERMEDIATE | MRAMBER1 | Approved | IVRS - Inspection :* |
08/27/2018 | BUILDING ABOVE CEILING | MRAMBER1 | Approved | IVRS - Inspection :* |
10/22/2018 | FRAMING | MRAMBER | Approved | East conf rooms ok Restrooms ok |
12/06/2018 | FIRE - ALARM FINAL | JPEELDAVIS | Approved | Need to unlatch access control on all stairwell doors on alarm |
12/27/2018 | FIREWALL/FIREBARRIER/FIRESTOP | RCAMACHO | Approved | South shaft level1 at fire damper only |
12/28/2018 | EXCAVATION/LAYOUT REBAR & ZON | RCAMACHO | Approved | canceled |
01/03/2019 | ELECTRIC - SERVICE UPGRADE | RCAMACHO | Approved | |
01/04/2019 | STUCCO MESH | RCAMACHO | Approved | |
01/17/2019 | PLUMBING - GAS PRESS TEST FNL | RCAMACHO | Approved | With first floor TI separate permit |
01/17/2019 | SITE - SEWER | RCAMACHO | Approved | Per Matt Ramber level one, two and a portion of five on separate TI permits |
01/30/2019 | OUTDOOR LIGHTING FINAL | RCAMACHO | Approved | |
01/30/2019 | ELECTRIC - FINAL | RCAMACHO | Approved | |
01/30/2019 | ELECTRIC - OUTDOOR LIGHTING | RCAMACHO | Approved | |
03/20/2019 | FIRE - FINAL | JPEELDAVIS | Approved | |
03/20/2019 | FIRE SPKLR - FINAL | JPEELDAVIS | Approved | |
03/21/2019 | PLUMBING - FINAL | ESTEVENS | Approved | |
03/21/2019 | MECHANICAL - FINAL | ESTEVENS | Approved | |
06/13/2019 | BUILDING - FINAL | CTREVIL | Approved |