Inspection History Details
Inspection Status: Approved
Inspection History: FIREWALL/FIREBARRIER/FIRESTOP
Permit Number - T17CM00673
Inspection Description - FIREWALL/FIREBARRIER/FIRESTOP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2019 | FIREWALL/FIREBARRIER/FIRESTOP | Approved | ||
| 12/27/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | South shaft level1 at fire damper only | |
| 12/05/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | South shaft, square up fire damper, others ok to start framing. | |
| 11/29/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | Bottom of grease chase 1st layer ok x3 | |
| 10/23/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | Restrooms lids,S.W. lidok | |
| 10/22/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | ||
| 10/19/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | ||
| 10/12/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | North West area C.L. "B" ceiling drywall ok | |
| 08/17/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | ||
| 08/09/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | SOUTH ELEVATOR AREAS AT LEVELS: #1, 2, 5 | |
| 08/03/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | levels 1,2 and 5 south elevators inner core ok | |
| 07/27/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | level 2 south elevator inner core board ok | |
| 07/20/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | ||
| 07/10/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | cancelled | |
| 07/03/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | inner layers at horiz shaft caps ok, ok to install 2nd layer of framing | |
| 06/29/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | tunnel area on ground floor | |
| 06/28/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | ||
| 06/26/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | 1st floor elevator face core board ok | |
| 06/20/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | 3 and 4 elevator core at door ok | |
| 06/19/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | ||
| 06/14/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | 5th floor elevator core board ok | |
| 06/04/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | 1st level elevator shaft | |
| 05/31/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | N.E. mechanical shaft 5th floor ok to 2 layer south mech. and elevator 3 and 4 ok |
|
| 05/18/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | FIRE STOP AT ELEVATOR DOORS FLOORS 2, 3 AND 4TH FLOORS NORTH STAIRWELL AND LOBBY 2, 3 AND 4TH FLOORS |
|
| 05/18/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | 4TH FLLOR SHAFT | |
| 05/16/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | 3rd and 4th floor shafts ok except face walls | |
| 05/09/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | no work, another failed inspectio will result in a re fee | |
| 05/08/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | no work | |
| 05/04/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | ||
| 04/25/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Denied | work not complete | |
| 04/19/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | 3rd and 4th floors shafts ok | |
| 04/17/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Denied | not complete, another failed inspection will result in a re-fee | |
| 04/12/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | no work | |
| 04/10/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Not ready for Inspection | no work | |
| 01/23/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | thru floor plmg. at restrooms 2nd and 3rd floors ok | |
| 01/18/2018 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | OK TO PROCEED WITH FLOOR PENETRATIONS | |
| 12/08/2017 | FIREWALL/FIREBARRIER/FIRESTOP | Partial Approval | met with contractor |