Permit: T17CM00673

Parcel: 117121900


Addresses:

40 E CONGRESS ST


Inspection Status: Approved

Inspection History: FIREWALL/FIREBARRIER/FIRESTOP

Permit Number - T17CM00673

Inspection Description - FIREWALL/FIREBARRIER/FIRESTOP

Inspection Status - Approved

Date Description Inspector Results Comments
01/15/2019 FIREWALL/FIREBARRIER/FIRESTOP Approved
12/27/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval South shaft level1 at fire damper only
12/05/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval South shaft, square up fire damper, others ok to start framing.
11/29/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval Bottom of grease chase 1st layer ok x3
10/23/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval Restrooms lids,S.W. lidok
10/22/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection
10/19/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection
10/12/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval North West area C.L. "B" ceiling drywall ok
08/17/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection
08/09/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval SOUTH ELEVATOR AREAS AT LEVELS: #1, 2, 5
08/03/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval levels 1,2 and 5 south elevators inner core ok
07/27/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval level 2 south elevator inner core board ok
07/20/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection
07/10/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection cancelled
07/03/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval inner layers at horiz shaft caps ok, ok to install 2nd layer of framing
06/29/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval tunnel area on ground floor
06/28/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection
06/26/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval 1st floor elevator face core board ok
06/20/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval 3 and 4 elevator core at door ok
06/19/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection
06/14/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval 5th floor elevator core board ok
06/04/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval 1st level elevator shaft
05/31/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval N.E. mechanical shaft 5th floor ok to 2 layer
south mech. and elevator 3 and 4 ok
05/18/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval FIRE STOP AT ELEVATOR DOORS FLOORS 2, 3 AND 4TH FLOORS
NORTH STAIRWELL AND LOBBY 2, 3 AND 4TH FLOORS
05/18/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval 4TH FLLOR SHAFT
05/16/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval 3rd and 4th floor shafts ok except face walls
05/09/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection no work, another failed inspectio will result in a re fee
05/08/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection no work
05/04/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection
04/25/2018 FIREWALL/FIREBARRIER/FIRESTOP Denied work not complete
04/19/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval 3rd and 4th floors shafts ok
04/17/2018 FIREWALL/FIREBARRIER/FIRESTOP Denied not complete, another failed inspection will result in a re-fee
04/12/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection no work
04/10/2018 FIREWALL/FIREBARRIER/FIRESTOP Not ready for Inspection no work
01/23/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval thru floor plmg. at restrooms 2nd and 3rd floors ok
01/18/2018 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval OK TO PROCEED WITH FLOOR PENETRATIONS
12/08/2017 FIREWALL/FIREBARRIER/FIRESTOP Partial Approval met with contractor