Permit: T17CM00673

Parcel: 117121900


Addresses:

40 E CONGRESS ST

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
07/31/2018 REINFORCED MASONRY PRE-GROUT Approved
07/30/2018 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
3RD LIFT SOUTH WALL 12'-8" LIFT
07/27/2018 REINFORCED MASONRY PRE-GROUT Partial Approval 2nd lift at south 9' section ok
07/25/2018 REINFORCED MASONRY PRE-GROUT Partial Approval 1st lift at south wall 9' section
06/20/2018 REINFORCED MASONRY PRE-GROUT Partial Approval east screen wall top out ok
06/19/2018 REINFORCED MASONRY PRE-GROUT Not ready for Inspection
06/15/2018 REINFORCED MASONRY PRE-GROUT Partial Approval 1st lift eastside screen wall ok
06/14/2018 REINFORCED MASONRY PRE-GROUT Not ready for Inspection no work
05/04/2018 REINFORCED MASONRY PRE-GROUT Partial Approval TOP OUT SCREEN WALL WEST
05/02/2018 REINFORCED MASONRY PRE-GROUT Denied verts to extend through bond beam
04/23/2018 REINFORCED MASONRY PRE-GROUT Not ready for Inspection no work
04/20/2018 REINFORCED MASONRY PRE-GROUT Partial Approval 1st lift S.W. sitewall ok
04/19/2018 REINFORCED MASONRY PRE-GROUT Not ready for Inspection no work
04/18/2018 REINFORCED MASONRY PRE-GROUT Partial Approval top out at radius and trash room ok
04/17/2018 REINFORCED MASONRY PRE-GROUT Not ready for Inspection no work
04/16/2018 REINFORCED MASONRY PRE-GROUT Partial Approval east trash entrance 3rd lift ok
04/12/2018 REINFORCED MASONRY PRE-GROUT Not ready for Inspection no work
04/11/2018 REINFORCED MASONRY PRE-GROUT Partial Approval 1st lift east radius, 2nd lift trash east entrance
12/07/2017 REINFORCED MASONRY PRE-GROUT Partial Approval top out at pump room ok
12/05/2017 REINFORCED MASONRY PRE-GROUT Partial Approval 1st lift 2nd level pump room
11/07/2017 REINFORCED MASONRY PRE-GROUT Not ready for Inspection no work
11/06/2017 REINFORCED MASONRY PRE-GROUT Partial Approval pump room bond beam lower level west
11/03/2017 REINFORCED MASONRY PRE-GROUT Partial Approval top out ok except pump room
11/02/2017 REINFORCED MASONRY PRE-GROUT Partial Approval top out south wall CL 4 west
11/01/2017 REINFORCED MASONRY PRE-GROUT Partial Approval 2nd lift ok
10/30/2017 REINFORCED MASONRY PRE-GROUT Partial Approval LOWER LEVEL 2ND LIFT GRID LINE 1 FROM E TO F
3RD LIFT GRID LINE E.5 FROM 1 TO 2
3RD LIFT GRID LINE 2.2 FROM E.75 TO F
TOP OUT STAIRWELL WALL
3RD LIFT GRID LINE F FROM 2.2 TO 3
3RD LIFT RADIUS WALL
2ND LIFT GRID LINE D.7 FROM 5 TO 6 WITH CONDUIT FOR LIGHTING ALL AREAS
10/27/2017 REINFORCED MASONRY PRE-GROUT Partial Approval 1st lift ok
10/24/2017 REINFORCED MASONRY PRE-GROUT Partial Approval stem wall bond beam ok