Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T17CM00673
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2019 | PLUMBING - ROUGH, SOIL | Approved | Per Matt Ramber level one, two and a portion of five on separate TI permits | |
| 08/17/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | DWV and Dom at east stairwell mop sink ok | |
| 04/11/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | no work | |
| 04/04/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | sewer tie in outside bldg ok | |
| 04/03/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | sewer tie in within bldg ok | |
| 03/23/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | grease receptor venting ok | |
| 03/22/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | 1st floor main to CL "C" ok to cover | |
| 03/15/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | domestic tie in ok | |
| 03/14/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | 5th level plmg rough ok | |
| 03/09/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | cancelled | |
| 03/08/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | west side grease receptors ok | |
| 03/01/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | cancelled | |
| 02/22/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | ok to cover grease receptors east side to bldg. | |
| 02/21/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | test failed | |
| 02/20/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | cancelled | |
| 02/16/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | cancelled per contractor | |
| 02/14/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | no work | |
| 02/13/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | TRASH AND PUMP ROOM GREASE LINE TO 6' FROM END OF BUILDING NORTH WEST | |
| 02/08/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | west grease waste from receptor inlet along west wall approx. 30' ok to back fill | |
| 02/07/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | 4" waste to grease trap inlet from 90 deg to existing bldg east side ok |