Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address:
9095 S RITA RD
Address NEW:
9095 S RITA RD
Apply Date:
09/22/2016
Applicant:
N/A
Description:
HOTEL
Architects:
  • FRANKS, MICHAEL WILLIAM
Contractors:
  • H S L CONSTRUCTION SERVICES L L C

Permit Reviews

Permit Number - T16CM07308
Permit Status: C of o
Permit Description: HOTEL
Start Date Submittal Complete Date Status  
02/09/2018 3RD PARTY REVIEW - REVISION/OTHER-2ND 07/03/2018 COMPLETED Review Details
07/03/2018 3RD PARTY REVIEW - REVISION/OTHER 07/05/2018 COMPLETED Review Details
07/12/2018 3RD PARTY REVIEW - REVISION/OTHER 07/16/2018 COMPLETED Review Details
09/22/2016 PLANS OK TO SUBMIT - COMM 09/26/2016 COMPLETED Review Details
09/23/2016 3RD PARTY REVIEW - COMMERCIAL 12/07/2017 COMPLETED Review Details
12/07/2017 3RD PARTY REVIEW - REVISION/OTHER 02/09/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T16CM07308
Permit Status: C of o
Permit Description: HOTEL
Total Outstanding Activity Conditions - 1
Date Name
09/22/2016 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T16CM07308
Permit Description: HOTEL
Total Completed Inspections - 44
Date Description Inspector Results Comments
03/13/2018 EXCAVATION/LAYOUT REBAR & ZON BJones Approved Bond Beam Approved
05/07/2018 PLUMBING - ROUGH, SOIL BJones Approved
05/07/2018 BUILDING PRE-SLAB BJones Approved
05/08/2018 FIRE SPKLR - FINAL BJones Approved
05/10/2018 SITE - SEWER BJONES Approved
05/10/2018 PLUMBING - SEWER HCS CONNECT BJONES Approved
06/22/2018 ELECTRIC - UNDERGROUND B JONES Approved CIRCUITS 36 AND 38 FOR LIGHT POLES
07/11/2018 ELECTRIC - OUTDOOR LIGHTING MHASSAN1 Approved OK TO POUR PART 1 OF THE LIGHT POLE BASES. CAN'T POUR ALL DUE TO RAIN WASHING MANY OF THEM OUT.
09/07/2018 EXT METAL CLIPS/EXT SHEATHING TVALENC1 Approved IVRS - Inspection :*
1- 2ND FLOOR EXTERIOR SHEAR WALL PANELS ARE OKAY.
2- 2ND FLOOR INTERIOR SHEAR WALL PANELS ARE OKAY, HOLD DOWNS IN PLACE.
3- 2ND FLOOR H2.5 AND A-35 CLIPS PROVIDED.
4- OKAY TO SHEET ROCK TUB AND SHOWER SURROUNDS.
10/19/2018 PLUMBING - GAS PRESSURE TEST BJONES Approved Gas line installed per plan, then changed to accomidate location modification of heater.
10/19/2018 PLUMBING - GAS PRESSURE TEST BJONES Approved
11/05/2018 BUILDING ABOVE CEILING TVALENCIA Approved 1- 1st and 2nd floor DWV system and overhead and in wall domestic water distribution okay to cover.
2- Note; this inspection is for the 1st and 2nd floor king studios only.
11/19/2018 MECHANICAL - INTERMEDIATE DMUNIZ Approved 2ND FLOOR EXHAUST FANS OK
11/21/2018 ROOF NAILING BJONES Approved Entire roof inspected for nailing per Plan 6” by 12” on center.
11/26/2018 STUCCO MESH DMUNIZ Approved SOUTH SIDE OF BUILDING
12/14/2018 SHEET ROCK NAILING BJONES Approved 1st floor Ok
OK to sheet rock 3rd floor Bathroom Lids
Mech exhaust ok to cover
12/14/2018 PLUMBING - ROOF DRAINS BJONES Approved
12/17/2018 ELECTRIC - INTERMEDIATE BJONES Approved 3rd Floor Intermediate Elect ok
12/18/2018 PLUMBING - INTERMEDIATE DMUNIZ Approved 3rd floor, 8 rooms ok east side of building.
12/20/2018 MECHANICAL - ABOVE CEILING BJONES Approved 2nd floor East of elevator Ok to Cover
12/20/2018 ELECTRIC - ABOVE CEILING BJONES Approved 2nd floor East of elevator, OK to Cover
12/21/2018 FRAMING DQUINN Approved Elevator shaft fire tape ok
12/21/2018 PLUMBING - ABOVE CEILING DQUINN Approved 3rd floor dwv, west of elevator ok
02/08/2019 ELECTRIC - CABLE DROP DQUINN Approved Clear eco
Ok to set main service meter for hotel
02/11/2019 TEP CLEARANCE - AM DQUINN Approved ECO
04/05/2019 GAS CLEARANCE DMUNIZ Approved
04/05/2019 PLUMBING - GAS PRESS TEST FNL DMUNIZ Approved Clear Southwest Gas
05/02/2019 FIRE - ALARM FINAL JPEELDAVIS Approved
05/07/2019 PLUMBING - MD GAS/PRECONST MTG DMUNIZ Approved
05/07/2019 OUTDOOR LIGHTING FINAL DMUNIZ Approved
05/07/2019 STEM WALL/RETAINING WALL DMUNIZ Approved
05/07/2019 U VALUE FOR WINDOW DMUNIZ Approved
05/07/2019 REINFORCED MASONRY PRE-GROUT DMUNIZ Approved
05/07/2019 ELECTRIC - UFER DMUNIZ Approved
05/07/2019 ELECTRIC - FINAL DMUNIZ Approved
05/09/2019 MECHANICAL - FINAL RSHERRY Approved REVIEW OF AIR BALANCE REPORT COMPLETED
05/09/2019 PLUMBING - FINAL RSHERRY Approved REVIEW OF WATER DISINFECTION REPORT COMPLETED
05/20/2019 ENGINEERING - FINAL RLEDONNE Approved
05/20/2019 NPPO - FINAL RLEDONNE Approved
05/20/2019 SIGN - FINAL RLEDONNE Approved
05/20/2019 LANDSCAPE - FINAL RLEDONNE Approved
06/05/2019 BUILDING - FINAL JGARCIA1 Approved
06/05/2019 RIGHT OF WAY - FINAL DROBERTS Approved
06/05/2019 FIRE - FINAL JPEELDAVIS Approved Per MAshford the phones provided at the elevator landings meet the intent of the two way communication. HSL knows that if they remove the phones they will no longer be code compliant. Tested the ERRC today and everything passed.
Approved for C of O