Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2019 | BUILDING ABOVE CEILING | Approved | ||
| 04/22/2019 | BUILDING ABOVE CEILING | Correction Required | Several holes remain to be sealed. Electrical on West end, and elevator lobby/vending area. Mechanical supports at East end | |
| 03/11/2019 | BUILDING ABOVE CEILING | Partial Approval | All 1st floor lids ok to cover | |
| 03/01/2019 | BUILDING ABOVE CEILING | Partial Approval | All Approved for Rec Room above ceiling. | |
| 01/28/2019 | BUILDING ABOVE CEILING | Partial Approval | 4th Floor Restrooms OK to Sheet Rock Lids | |
| 11/05/2018 | BUILDING ABOVE CEILING | Partial Approval | 1- 1st and 2nd floor DWV system and overhead and in wall domestic water distribution okay to cover. 2- Note; this inspection is for the 1st and 2nd floor king studios only. |