Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
Permit Number - T16CM07308
Inspection Description - FIRE SPKLR - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/02/2019 | FIRE SPKLR - FINAL | Approved | ||
04/30/2019 | FIRE SPKLR - FINAL | Partial Approval | Need to add heads in the following areas: Room #223 #224 #221 #218 #323 in the bathrooms Need to verify the 4th floor trash chute head Room # 425 & 426 and the 3rd floor ice machine are missing the escutcheon. |
|
05/08/2018 | FIRE SPKLR - FINAL | Approved |