Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: SHEET ROCK NAILING
Permit Number - T16CM07308
Inspection Description - SHEET ROCK NAILING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/07/2019 | SHEET ROCK NAILING | Approved | ||
01/28/2019 | SHEET ROCK NAILING | Partial Approval | 3RD Floor Sheet Rock Complete | |
01/09/2019 | SHEET ROCK NAILING | Approved | 2nd Floor Sheet Rock Nail | |
12/14/2018 | SHEET ROCK NAILING | Partial Approval | 1st floor Ok OK to sheet rock 3rd floor Bathroom Lids Mech exhaust ok to cover |
|
11/21/2018 | SHEET ROCK NAILING | Approved | Fitness, Laundry, East of Elevator area. | |
11/14/2018 | SHEET ROCK NAILING | Partial Approval | 1- 1st floor guest rooms sheet rock nailing is okay for tape and mud. | |
11/06/2018 | SHEET ROCK NAILING | Partial Approval | 1- Sheet rock nailing is okay for the 3rd floor corridor ceiling is okay to tape and mud. | |
10/31/2018 | SHEET ROCK NAILING | Partial Approval | 1-2nd floor corridor ceiling sheet rock nailing is okay to tape and mud. | |
10/26/2018 | SHEET ROCK NAILING | Partial Approval | 1- Sheet rock nailing okay for 1st floor exterior Dens Glass only. | |
10/24/2018 | SHEET ROCK NAILING | Partial Approval | 1- Third floor sheet rock at top of corridor ceiling is okay to tape and mud. 2- East exterior end wall from the 4th floor to the top of parapet per detail S5.2 detail 1 |
|
09/25/2018 | SHEET ROCK NAILING | Partial Approval | IVRS - Inspection :* 1- FIRST FLOOR HALLWAY LID OKAY FOR TAPE AND MUD FROM THE DOUBLE DOORS TO THE THE END OF THE WEST WING ONLY. |
|
09/24/2018 | SHEET ROCK NAILING | Partial Approval | SHEET ROCK NAILING FOR THE WET WALLS AND SURROUNDS ONLY LOCATED ON THE 2ND FLOOR IS OKAY FOR TAPE AND MUD. | |
09/19/2018 | SHEET ROCK NAILING | Partial Approval | IVRS - Inspection :* 1- SHEET ROCK NAILING FOR THE FIRST FLOOR CORRIDOR CEILING ONLY AND TUB AND SHOWER SURROUNDS FROM THE DOUBLE DOORS CORRIDOR TO THE EAST EXIT WAY IS OKAY FOR TAPE AND MUD. |