Permit: T11CM00338
Permit Details
Apply Date:
01/31/2011
Applicant:
N/A
Description:
ADDITION:CHURCH & REMODEL EXISTING STUDENT CENTER
Architects:
- MASCIA, FRANK
Contractors:
- W.E.O'NEIL CONSTRUCTION CO. INC
Permit Reviews
Permit Number - T11CM00338
Permit Status: C of o
Permit Description: ADDITION:CHURCH & REMODEL EXISTING STUDENT CENTER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/31/2011 | SITE | 02/03/2011 | COMPLETED |
| 02/03/2011 | SITE | 03/09/2011 | COMPLETED |
| 03/09/2011 | PLANS OK TO SUBMIT - COMM | 03/11/2011 | COMPLETED |
| 03/14/2011 | RESUBMITTAL - SITE ALL | 04/08/2011 | COMPLETED |
| 03/14/2011 | COMMERCIAL - TI | 04/09/2011 | COMPLETED |
| 04/08/2011 | RESUBMITTAL - SITE ALL | 05/05/2011 | COMPLETED |
| 04/12/2011 | RESUBMITTAL | 05/05/2011 | COMPLETED |
| 05/05/2011 | RESUBMITTAL - SITE | 05/20/2011 | COMPLETED |
| 05/11/2011 | RESUBMITTAL | 05/25/2011 | COMPLETED |
| 05/20/2011 | RESUBMITTAL - SITE | 05/25/2011 | COMPLETED |
| 08/02/2011 | REVISION - - 1ST | 08/11/2011 | COMPLETED |
| 11/17/2011 | REVISION - - 2ND | 11/17/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11CM00338
Permit Status: C of o
Permit Description: ADDITION:CHURCH & REMODEL EXISTING STUDENT CENTER
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/31/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T11CM00338
Permit Description: ADDITION:CHURCH & REMODEL EXISTING STUDENT CENTER
Total Completed Inspections - 38
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2011 | ROOF NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 10/11/2011 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER R. HOLLANDER |
| 10/31/2011 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* |
| 11/17/2011 | PLUMBING - PROGRESS | RMYERS | Approved | IVRS - Inspection :* |
| 11/18/2011 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
| 11/22/2011 | EXCAVATION/LAYOUT REBAR & ZON | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/05/2011 | ELECTRIC - PROGRESS | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/05/2011 | ELECTRIC - SERVICE UPGRADE | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/05/2011 | ELECTRIC - TEMPORARY SERVICE | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/05/2011 | ELECTRIC - SERVICE RELOCATION | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/05/2011 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/05/2011 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/05/2011 | ELECTRIC - UNDERGROUND | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/05/2011 | ELECTRIC - UFER | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/06/2011 | ELECTRIC - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
| 12/08/2011 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
| 12/08/2011 | MECHANICAL - HOODS | MRAMBER | Approved | IVRS - Inspection :* |
| 12/08/2011 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
| 12/08/2011 | RIGHT OF WAY - FINAL | P.Whiddon | Approved | |
| 12/09/2011 | NPPO - FINAL | MRUSSO | Approved | |
| 12/09/2011 | SIGN - FINAL | MRUSSO | Approved | |
| 12/21/2011 | BUILDING - PROGRESS | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/21/2011 | STUCCO MESH | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/21/2011 | BUILDING ABOVE CEILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/21/2011 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/21/2011 | BUILDING PRE-SLAB | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/22/2011 | BUILDING - FINAL | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/22/2011 | CERTIFICATE OF OCCUPANCY | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/22/2011 | FIRE - FINAL | DSIWARSKI | Approved | Required contractor to remove thumb turn dead bolt on East door (main floor) with panic hardware. They removed the thumb turn dead bolt while I was on the job site to observe. |
| 12/22/2011 | FIRE SPKLR - FINAL | DSIWARSKI | Approved | |
| 12/22/2011 | LANDSCAPE - FINAL | MRUSSO | Approved | |
| 12/22/2011 | ENGINEERING - FINAL | MRUSSO | Approved | THE WEST PEDESTRIAN ACCESS RAMP DOES NOT MEET THE SLOPE SHOWN ON THE APPROVED PLAN, RAMP IS AT 9% AND THE SITE PLAN SHOWS 7% SLOPE. THE ENGINEER OF RECORD AND THE CITY OF TUCSON ENGINEERING REVIEWER (LAUREN MANKUS) STATED THAT AS LONG AS ONE ACCESS POINT MEETS ADA, THE WEST SIDE ACCESS RAMP CAN STAY AT ITS CURRENT SLOPE, AND THE ACCURATE ELEVATION MUST BE SHOWN ON THE AS-BUILT. ALL OTHER PUNCHLIST ITEMS LISTED HAVE BEEN ADDRESSED. APPROVED PER LAUREN MANKUS |
| 12/23/2011 | PLUMBING - ABOVE CEILING | RMYERS | Approved | PER PL FINAL |
| 12/23/2011 | PLUMBING - INTERMEDIATE | RMYERS | Approved | PER PL FINAL |
| 12/23/2011 | PLUMBING - PRE SLAB | RMYERS | Approved | PER PL FINAL |
| 12/23/2011 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | PER PL FINAL |
| 12/23/2011 | PLUMBING - FINAL | RMYERS | Approved | PER INSPECTION CARD |
| 12/23/2011 | HEALTH DEPT - FINAL 724-7908 | NRAMIREZ | Approved | PER APPROVAL LETTER |