Permit Number: T11CM00338
Parcel: 124010150

Address:
1245 E 2ND ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM00338
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/14/2011 DAVE MANN FIRE REVIEW Denied Fire Comments:

Doors other than the main doors from rooms 301, 307, and 308 need panis hardware per IFC Section 1008.1.9.
03/16/2011 GERRY KOZIOL WWM REVIEW Denied NEED TO PROVIDE ADDITIONAL INFORMATION TO WASTEWATER FOR CREDIT EVALUATION IF APPLICABLE.
NEED WASTEWATER 3RD FLOOR CAPACITY EVALUATION
CHECK WITH CHAD FOR COMMERCIAL/SFR RATE EVALUATION PRIOR TO PERMIT ISSUANCE
03/23/2011 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: University of Arizona Hillel Student Center Expansion
T11CM00338
Building Plan (1st Review)

TRANSMITTAL DATE: March 23, 2011


1. The building, canopy and fuel tank plans have been reviewed by Zoning Review Section but cannot approve the plans until all zoning comments or concerns have been addressed.

2. Zoning can not approve the plans until the site plan has been approved.

3. Zoning will re-review the plans on the next submittal to insure compliance with the approved and site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\building\t11cm00338.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:
03/28/2011 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied GENERAL
1. For purposes of assessing additional plan review fees, please send a letter to the building official, Mr. Ron Boose, summarizing all the submittals being deferred.
2. Please provide an Exiting Plan showing exit travel distances, common path of egress travel, required exits and exit load.
a. Reconcile the required exits doors with the exit doors marked as such on the electrical plan.
b. Provide panic hardware on all doors required as per section 1008.1.9.
3. Need Health Department review.
SHEET 0.2
4. Please provide total occupancy load for a new Certificate of Occupancy.
SHEET 1.1.1
5. The door on the west side of the new elevator is show on the electrical plan as a required exit with an exit light. It is not identified as an exit door on this floor plan. Please reconcile.
6. The door on the East side of the Lounge is show on the electrical plan as a required exit with an exit light. It is not identified as an exit door on this floor plan. Please reconcile.
a. If indeed it is a required exit, please show exiting load on the new exit plan and if it more than 50, please swing the door outward.
SHEET 1.1.3
7. Details 1 and 4: Provide vertical grab bars as per ICC (ANSI 117.1), Section 604.5.1.
8. Generic code copied accessible details are not acceptable. Please provide all the accessible requirements on the actual designed toilet plan and elevations. Please delete all other details not directly associated with this project.
9. Detail B:
a. Provide all required compliant dimensions.
b. Relocate grab bars on furred wall surface.
c. Dimensions shown are not to finished wall surface. Please reconcile.
10. Please provide accurate toilet room dimensions at Detail "A".
11. Provide actual designed elevation of water dispensers plus all required accessible dimensions.
SHEET 1.1.5
12. Provide reduced vertical clearance barriers at both stairs as per Section 307.4.
SHEET 3.0
13. Please provide additional Special Inspection Certifications required for this job as outlined in the Conditions Menu of this permit application.
SHEET 3.3
14. This sheet is missing in one set of the submittal drawings.
SHEET 7.1
15. Please provide a guard rail around the Westerly roof hatch as required by Section 1009.11.2.
STRUCTURAL CALCULATIONS MANUAL
16. Because of the absence of a foundation and roof framing key plan, the structural review could not be completed. Please provide both a foundation and roof framing key plan in the calculations and resubmit for review completion.
END OF REVIEW
03/29/2011 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
03/30/2011 ROBERT SHERRY WATER REVIEW Denied 1. Provide the size of the existing water meter and its associated reduced pressure backflow preventer.
2. Provide the demand for the existing water meter.
03/30/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Reprint sheets 15.9, 15.10, 15.11, and 15.12 so that the background floor plans are legible. Reference: Section 103.2.3, UPC 2006.
2. Revise the backflow devices specified in detail 2/15.13 to coordinate with the Kitchen General Notes shown on sheet 15.15. Reference: Section 603.1, UPC 2006.
3. Provide water pressure and water pipe sizing calculations; note that this building is "assembly occupancy". Reference: Section 610.1, UPC 2006.
4. Note the minimum size of branch piping to be used for the urinal flush valve; ¾" copper tubing will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference: Sections 610.12 and A 6.1, UPC 2006 and IS 3-2003, Section 2.6.
5. Show the complete natural gas piping system that is to be revised; provide all of the connected loads and the developed lengths from the meter to the gas-fired appliances (e.g. the existing water heater and the existing rooftop A/C unit). Reference: Sections 103.2.3, 1209.1.1, and 1209.1.2, UPC 2006.
6. Clarify how the proposed location of the gravity grease interceptor complies with the requirements of Section 1014.3.4.1, UPC 2006.
03/31/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide envelope energy code compliance calculations for the building envelope using the correct climate zone (Pima County < 4,000 feet). Provide sufficient detail on the drawings to evaluate the envelope energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Include documentation for envelope components noted on the calculations as "other". Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006.
2. Provide a design for the proposed Type I grease hood, including performance and construction data for the hood. Provide structural calculations and details to show that the Type I [Type II] hood is supported from the building structure in accordance with Section 507.6, IMC 2006. Reference: Sections 302.1, 507, and 508, IMC 2006.
3. Clarify the size of the grease exhaust duct for the Type I hood: it is shown as 22"x9" on the plans but 20"x9" in the key notes (2/15.1).
4. Provide a Type II hood for the two microwave ovens and the dishwasher. (Note that the Kitchen Equipment Schedule has duplicate equipment numbers with different equipment descriptions.) Reference: Section 507.2.2, IMC 2006.
03/31/2011 LOREN MAKUS ENGINEERING REVIEW Denied Site plan must be approved.
04/09/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
04/08/2011 DELMA ROBEY OUT TO CUSTOMER Completed