Permit: T10CM02874
Permit Details
Status:
Final
Type:
COMMERCIAL OTHER
Address:
275 N COMMERCE PARK LP
Address NEW:
275 N COMMERCE PARK LP
Apply Date:
10/14/2010
Applicant:
N/A
Description:
NEW SHELL THREE STORY BUILDING-QIP
Contractors:
- SUNDT CONSTRUCTION
Permit Reviews
Permit Number - T10CM02874
Permit Status: Final
Permit Description: NEW SHELL THREE STORY BUILDING-QIP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/03/2011 | RESUBMITTAL | 03/10/2011 | COMPLETED |
| 02/09/2011 | REVISION - - 1ST | 03/02/2011 | COMPLETED |
| 03/02/2011 | REVISION - - 1ST | 04/08/2011 | COMPLETED |
| 03/10/2011 | RESUBMITTAL | 03/22/2011 | COMPLETED |
| 03/29/2011 | RESUBMITTAL | 03/29/2011 | COMPLETED |
| 03/29/2011 | RESUBMITTAL | 04/08/2011 | COMPLETED |
| 10/14/2010 | PLANS OK TO SUBMIT - COMM | 11/18/2010 | COMPLETED |
| 12/01/2010 | COMMERCIAL - NEW | 01/13/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10CM02874
Permit Status: Final
Permit Description: NEW SHELL THREE STORY BUILDING-QIP
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/14/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10CM02874
Permit Description: NEW SHELL THREE STORY BUILDING-QIP
Total Completed Inspections - 33
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2011 | FIRE SPKLR - UG, PIPING, HYDRO | MBROWN | Approved | |
| 07/12/2011 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* |
| 07/20/2011 | EXT METAL CLIPS/EXT SHEATHING | AQUIROZ | Approved | IVRS - Inspection :* 1) PROGRESS AREA WEST SIDE DENS GLASS |
| 08/05/2011 | FIRE SPKLR - UG PIPING FLUSH | DSIWARSKI | Approved | |
| 08/29/2011 | ROOF NAILING | AQUIROZ | Approved | IVRS - Inspection :* 1) VISITOR CENTER OK |
| 09/08/2011 | BUILDING PRE-SLAB | JBURGE | Approved | IVRS - Inspection :* 1) SOUTH ? SLAB OK TO POUR SLABS |
| 09/15/2011 | PLUMBING - GAS PRESSURE TEST | RMYERS | Approved | IVRS - Inspection :* |
| 09/23/2011 | FIRE SPKLR - OH PIPING & HYDRO | WMOTTO | Approved | |
| 09/23/2011 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 09/23/2011 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* |
| 10/28/2011 | STEM WALL/RETAINING WALL | AQUIROZ | Approved | IVRS - Inspection :* |
| 11/01/2011 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection :* |
| 11/15/2011 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* |
| 11/21/2011 | PLUMBING - GAS PRESS TEST FNL | RMYERS | Approved | IVRS - Inspection :* |
| 11/23/2011 | EXCAVATION/LAYOUT REBAR & ZON | AQUIROZ | Approved | 1 LIGHT POLE BASE NW CORNER |
| 11/23/2011 | PLUMBING - ROOF DRAINS | RMYERS | Approved | IVRS - Inspection :* |
| 11/23/2011 | FIREWALL/FIREBARRIER/FIRESTOP | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/19/2011 | REINFORCED MASONRY PRE-GROUT | AQUIROZ | Approved | IVRS - Inspection :* 1) 1ST LIFT NORTH ENTRY, TOP OUT ON PLANTER AND TOP OUT ON EQUIPMENT WALL |
| 12/23/2011 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :* NOBODY IN SUNDT TRAILER. UNABLE TO GAIN ACCESS. REINSPECTED: 4" TAPPED 8" MAIN PER DELTA 3 REVISION - NEED TO SEE REVISED APPROVED PLAN 4" UP TO BLDG ONLY |
| 02/02/2012 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection :* 1) WITH THE EXCEPTION OF RED LINE CHANGES, ARCHITECT SUPPLEMENTAL INSTRUCTIONS, AND ON GOING CHANGES ORDERS, THE PLUMBING IS COMPLETE 2) SOME CHANGE ORDERS INCLUDE, BUT ARE NOT LIMITED TO: ROOF DRAINS-SCUPPER CHANGED AT GARAGE, ROOF DRAIN-SCUPPER CHANGED AT V.S.F., ROOF DRAIN-CHANGE AT ENTRY, DRAIN PIPING FROM FLAMMABLE WASTE/SAND SOIL SEPERATOR TO SANITARY SEWER AND ALL OUTSTANDING ASI'S 3) BACKFLOW CERTS ON SITE 4) RECEIVED CLEAN BACTERIA REPORT 5) ALL PIPING WAS INSTALLED PER UNAPPROVED CAD DRAWINGS |
| 02/03/2012 | BUILDING - PROGRESS | AQUIROZ | Approved | IVRS - Inspection :* |
| 02/24/2012 | ENGINEERING - FINAL | MRUSSO | Approved | CONDITIONAL APPROVAL FOR ENGINEERING FINAL, GRADING PERMIT AND CONDITIONS UNDER THAT PERMIT (#T10BU01122) WILL BE COMPLETED AT A LATER TIME. |
| 02/24/2012 | LANDSCAPE - FINAL | MRUSSO | Approved | |
| 02/24/2012 | NPPO - FINAL | MRUSSO | Approved | |
| 02/24/2012 | SIGN - FINAL | MRUSSO | Approved | |
| 02/28/2012 | ZONING - FINAL | LHANLY | Approved | D10-0027 HAS BEEN APPROVED FOR LOT COMBO |
| 02/28/2012 | PLUMBING - PROGRESS | LHANLY | Approved | |
| 02/28/2012 | PLUMBING - PRE SLAB | LHANLY | Approved | |
| 02/28/2012 | FIRE - ALARM FINAL | FIRE | Approved | |
| 02/28/2012 | FIRE SPKLR - FINAL | FIRE | Approved | |
| 02/28/2012 | BUILDING - FINAL | LHANLY | Approved | |
| 02/28/2012 | U VALUE FOR WINDOW | LHANLY | Approved | |
| 02/28/2012 | FIRE - FINAL | FIRE | Approved |