Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address NEW:
275 N COMMERCE PARK LP
Apply Date:
10/14/2010
Applicant:
N/A
Description:
NEW SHELL THREE STORY BUILDING-QIP
Contractors:
  • SUNDT CONSTRUCTION

Permit Reviews

Permit Number - T10CM02874
Permit Status: Final
Permit Description: NEW SHELL THREE STORY BUILDING-QIP
Start Date Submittal Complete Date Status  
02/03/2011 RESUBMITTAL 03/10/2011 COMPLETED Review Details
02/09/2011 REVISION - - 1ST 03/02/2011 COMPLETED Review Details
03/02/2011 REVISION - - 1ST 04/08/2011 COMPLETED Review Details
03/10/2011 RESUBMITTAL 03/22/2011 COMPLETED Review Details
03/29/2011 RESUBMITTAL 03/29/2011 COMPLETED Review Details
03/29/2011 RESUBMITTAL 04/08/2011 COMPLETED Review Details
10/14/2010 PLANS OK TO SUBMIT - COMM 11/18/2010 COMPLETED Review Details
12/01/2010 COMMERCIAL - NEW 01/13/2011 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T10CM02874
Permit Status: Final
Permit Description: NEW SHELL THREE STORY BUILDING-QIP
Total Outstanding Activity Conditions - 1
Date Name
10/14/2010 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T10CM02874
Permit Description: NEW SHELL THREE STORY BUILDING-QIP
Total Completed Inspections - 33
Date Description Inspector Results Comments
05/12/2011 FIRE SPKLR - UG, PIPING, HYDRO MBROWN Approved
07/12/2011 PLUMBING - ROUGH, SOIL RMYERS Approved IVRS - Inspection :*
07/20/2011 EXT METAL CLIPS/EXT SHEATHING AQUIROZ Approved IVRS - Inspection :*
1) PROGRESS AREA WEST SIDE DENS GLASS
08/05/2011 FIRE SPKLR - UG PIPING FLUSH DSIWARSKI Approved
08/29/2011 ROOF NAILING AQUIROZ Approved IVRS - Inspection :*
1) VISITOR CENTER OK
09/08/2011 BUILDING PRE-SLAB JBURGE Approved IVRS - Inspection :*
1) SOUTH ? SLAB OK TO POUR SLABS
09/15/2011 PLUMBING - GAS PRESSURE TEST RMYERS Approved IVRS - Inspection :*
09/23/2011 FIRE SPKLR - OH PIPING & HYDRO WMOTTO Approved
09/23/2011 SHEET ROCK NAILING AQUIROZ Approved IVRS - Inspection :*
09/23/2011 FRAMING AQUIROZ Approved IVRS - Inspection :*
10/28/2011 STEM WALL/RETAINING WALL AQUIROZ Approved IVRS - Inspection :*
11/01/2011 PLUMBING - YARD WTR LINE/TEST RMYERS Approved IVRS - Inspection :*
11/15/2011 PLUMBING - ABOVE CEILING RMYERS Approved IVRS - Inspection :*
11/21/2011 PLUMBING - GAS PRESS TEST FNL RMYERS Approved IVRS - Inspection :*
11/23/2011 EXCAVATION/LAYOUT REBAR & ZON AQUIROZ Approved 1 LIGHT POLE BASE NW CORNER
11/23/2011 PLUMBING - ROOF DRAINS RMYERS Approved IVRS - Inspection :*
11/23/2011 FIREWALL/FIREBARRIER/FIRESTOP AQUIROZ Approved IVRS - Inspection :*
12/19/2011 REINFORCED MASONRY PRE-GROUT AQUIROZ Approved IVRS - Inspection :*
1) 1ST LIFT NORTH ENTRY, TOP OUT ON PLANTER AND TOP OUT ON EQUIPMENT WALL
12/23/2011 PLUMBING - INTERMEDIATE RMYERS Approved IVRS - Inspection :*
NOBODY IN SUNDT TRAILER. UNABLE TO GAIN ACCESS.
REINSPECTED:
4" TAPPED 8" MAIN PER DELTA 3 REVISION - NEED TO SEE REVISED APPROVED PLAN
4" UP TO BLDG ONLY
02/02/2012 PLUMBING - FINAL RMYERS Approved IVRS - Inspection :*
1) WITH THE EXCEPTION OF RED LINE CHANGES, ARCHITECT SUPPLEMENTAL INSTRUCTIONS, AND ON GOING CHANGES ORDERS, THE PLUMBING IS COMPLETE
2) SOME CHANGE ORDERS INCLUDE, BUT ARE NOT LIMITED TO: ROOF DRAINS-SCUPPER CHANGED AT GARAGE, ROOF DRAIN-SCUPPER CHANGED AT V.S.F., ROOF DRAIN-CHANGE AT ENTRY, DRAIN PIPING FROM FLAMMABLE WASTE/SAND SOIL SEPERATOR TO SANITARY SEWER AND ALL OUTSTANDING ASI'S
3) BACKFLOW CERTS ON SITE
4) RECEIVED CLEAN BACTERIA REPORT
5) ALL PIPING WAS INSTALLED PER UNAPPROVED CAD DRAWINGS
02/03/2012 BUILDING - PROGRESS AQUIROZ Approved IVRS - Inspection :*
02/24/2012 ENGINEERING - FINAL MRUSSO Approved CONDITIONAL APPROVAL FOR ENGINEERING FINAL, GRADING PERMIT AND CONDITIONS UNDER THAT PERMIT (#T10BU01122) WILL BE COMPLETED AT A LATER TIME.
02/24/2012 LANDSCAPE - FINAL MRUSSO Approved
02/24/2012 NPPO - FINAL MRUSSO Approved
02/24/2012 SIGN - FINAL MRUSSO Approved
02/28/2012 ZONING - FINAL LHANLY Approved D10-0027 HAS BEEN APPROVED FOR LOT COMBO
02/28/2012 PLUMBING - PROGRESS LHANLY Approved
02/28/2012 PLUMBING - PRE SLAB LHANLY Approved
02/28/2012 FIRE - ALARM FINAL FIRE Approved
02/28/2012 FIRE SPKLR - FINAL FIRE Approved
02/28/2012 BUILDING - FINAL LHANLY Approved
02/28/2012 U VALUE FOR WINDOW LHANLY Approved
02/28/2012 FIRE - FINAL FIRE Approved