Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Address NEW:
1151 E HERMANS RD #848
Apply Date:
04/29/2009
Applicant:
N/A
Description:
TI:OFFICE/LAB SPACES & WALL:PATIO 58 LF OF 10' HIGH
Contractors:
  • CORE CONSTRUCTION SERVICES OF ARIZONA INC

Permit Reviews

Permit Number - T09CM01053
Permit Status: C of o
Permit Description: TI:OFFICE/LAB SPACES & WALL:PATIO 58 LF OF 10' HIGH
Start Date Submittal Complete Date Status  
04/29/2009 PLANS OK TO SUBMIT - 3RD PARTY 04/29/2009 COMPLETED Review Details
04/29/2009 3RD PARTY REVIEW-COMMERCIAL TI 05/20/2009 COMPLETED Review Details
05/20/2009 POST 3RD PARTY REVIEW 06/02/2009 COMPLETED Review Details
06/02/2009 RESUBMITTAL 06/04/2009 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T09CM01053
Permit Status: C of o
Permit Description: TI:OFFICE/LAB SPACES & WALL:PATIO 58 LF OF 10' HIGH
Total Outstanding Activity Conditions - 1
Date Name
04/29/2009 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T09CM01053
Permit Description: TI:OFFICE/LAB SPACES & WALL:PATIO 58 LF OF 10' HIGH
Total Completed Inspections - 33
Date Description Inspector Results Comments
08/11/2009 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
1) NEEDED MECH INSPECTION
08/14/2009 STEM WALL/RETAINING WALL MHENSON Approved IVRS - Inspection :*
1) VIEWED SPECIAL INSPECTIONS
08/20/2009 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*
PRE-SLAB FOR FLOOR SINK AT NORTH AAV WILL BE INSPECTED BY BLD. INSPECTOR
08/20/2009 PLUMBING - PROGRESS RRICH Approved IVRS - Inspection :*
08/26/2009 BUILDING PRE-SLAB MHENSON Approved IVRS - Inspection :*
1) #4 BONDING WIRE 25' LOOPED THRU SLAB TIED TO REBAR
2) WEST TECH SPECIAL INSPECTED
09/02/2009 REINFORCED MASONRY PRE-GROUT MHENSON Approved IVRS - Inspection :*
1) MECH AND BOILER WALLS TOP OUT
2) NEED SPECIAL INSPECTION
09/18/2009 FIRE - ALARM FINAL LTHOMAS Approved OK for temp C of O - Phase 1
09/18/2009 FIRE SPKLR - FINAL LTHOMAS Approved OK for temp C of O - Phase 1
10/19/2009 PLUMBING - GAS PRESSURE TEST RLEDONNE Approved IVRS - Inspection :*
1) 60 PSI ON LAST 60' OF GAS PIPING OK
2) PROVIDE RED LINE DRAWINGS FOR ALL CHANGES
10/22/2009 PLUMBING - GAS PRESS TEST FNL RLEDONNE Approved IVRS - Inspection :*
1) COMPLETE ALL GAS PIPING
2) SOAP TEST LATER, FITTING TO BE INSTALLED
3) PROVIDE BACKFLOW CERT
4) INSTALL MAKE UP WATER PER APPROVED PLAN
10/27/2009 ELECTRIC - INTERMEDIATE RJIROUDE Approved IVRS - Inspection :*
1) OK SURFACE MOUNTED RACEWAYS ON WALL PHASE II
2) OK TO CABLE TRAY BOND TO BLDG STEEL
11/05/2009 PLUMBING - ABOVE CEILING RLEDONNE Approved IVRS - Inspection :*
1) LAB #123 THRU 126 AND COFERENCE #120
2) NO PLUMBING ABOVE CEILING IN THIS AREA
11/05/2009 BUILDING ABOVE CEILING MHENSON Approved IVRS - Inspection :*
1) LABS 123,124,125,126,120,122,121 AND CONFERENCE ROOM
11/06/2009 ELECTRIC - FINAL RHOLLAND Approved IVRS - Inspection :*
1) OK TEMP PHASES II LAB AREAS
2) OK OUTDOOR EQUIPMENT EAST/SOUTH
11/06/2009 BUILDING - FINAL MHENSON Approved IVRS - Inspection :*
1) PHASE II ROOM 124-126 OK WITH FIRE TO OCCUPY
11/06/2009 PLUMBING - FINAL RLEDONNE Approved IVRS - Inspection :*
1) NOTES FROM 11/05/09 ARE THE SAME AS 11/06/09
11/06/2009 ELECTRIC - PROGRESS RHOLLAND Approved IVRS - Inspection :*
11/06/2009 ELECTRIC - ABOVE CEILING RHOLLAND Approved IVRS - Inspection :*
11/17/2009 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
11/30/2009 MECHANICAL - ABOVE CEILING MRAMBER Approved IVRS - Inspection :*
11/30/2009 MECHANICAL - INTERMEDIATE MRAMBER Approved IVRS - Inspection :*
12/10/2009 EXCAVATION/LAYOUT REBAR & ZON MHENSON Approved IVRS - Inspection :*
1) CONCRETE CURB WEST OF BLDG
2) WEST TECH SPECIAL INSPECTED
12/30/2009 FRAMING MHENSON Approved IVRS - Inspection :*
1) PHASE 4 130-B,C,D & E
12/31/2009 SHEET ROCK NAILING JBURGE Approved IVRS - Inspection :*
1) AIR LOCK #130 (1ST LAYER) HALLWAY (GALLY) #144 OK TO COVER PROGRESS AREAS
03/04/2010 FIRE - FINAL LTHOMAS Approved
04/21/2010 MECHANICAL - PROGRESS MRAMBER Approved IVRS - Inspection :*
05/18/2010 ELECTRIC - UNDERGROUND RHOLLAND Approved IVRS - Inspection :*
05/21/2010 BUILDING - PROGRESS GDABBS Approved
05/24/2010 NPPO - FINAL JFEMLING Approved Approved
05/24/2010 LANDSCAPE - FINAL JFEMLING Approved Approved
05/24/2010 SIGN - FINAL JYBARRA Approved
05/25/2010 RIGHT OF WAY - FINAL LLopez Approved In Pima County right-of-way
08/03/2010 ENGINEERING - FINAL JFEMLING Approved Ramp replaced and in conformance. Approved