Permit: T08CM02395
Permit Details
Apply Date:
07/08/2008
Applicant:
N/A
Description:
68 UNIT RESIDENTIAL TOWER
Architects:
- MELARA, GEORGE A
Contractors:
- LLOYD CONSTRUCTION COMPANY INC ,
Permit Reviews
Permit Number - T08CM02395
Permit Status: C of o
Permit Description: 68 UNIT RESIDENTIAL TOWER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/20/2009 | POST 3RD PARTY REVIEW | 03/03/2009 | COMPLETED |
05/08/2009 | RESUBMITTAL | 05/21/2009 | COMPLETED |
05/21/2009 | RESUBMITTAL | 07/29/2009 | COMPLETED |
07/08/2008 | PLANS OK TO SUBMIT - 3RD PARTY | 07/10/2008 | COMPLETED |
07/10/2008 | 3RD PARTY REVIEW-COMMERCIAL | 02/20/2009 | COMPLETED |
07/29/2009 | RESUBMITTAL | 08/03/2009 | COMPLETED |
08/03/2009 | RESUBMITTAL | 08/05/2009 | COMPLETED |
11/18/2009 | 3RD PARTY REVIEW-REVISION/OTHER | 11/18/2009 | COMPLETED |
12/17/2009 | REVISION - - 1ST | 12/21/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08CM02395
Permit Status: C of o
Permit Description: 68 UNIT RESIDENTIAL TOWER
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/08/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T08CM02395
Permit Description: 68 UNIT RESIDENTIAL TOWER
Total Completed Inspections - 52
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/24/2009 | ELECTRIC - CONSTRUCTION POWER | DSANTACR | Approved | IVRS - Inspection :* 1) TEC TEMP SERVICE STRUCTURE AT NORTH END OF PROJECT 2) NO BOND REQUIRED 3) THIS INSPECTION SHOULD HAVE BEEN ON ACTIVITY #T07CM03033 |
11/16/2009 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* 1) DENSGLASS AT SOUTHEAST CORNER AT STAIRWELL #4 |
11/19/2009 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :* 1) N/H RISERS AT ELEVATOR SHAFT AND AT SOUTH END OK TO INFILL CMU BLOCK |
12/09/2009 | REINFORCED MASONRY PRE-GROUT | AQUIROZ | Approved | IVRS - Inspection :* |
12/14/2009 | BUILDING PRE-SLAB | AQUIROZ | Approved | IVRS - Inspection :* STAIRWAY TREADS |
12/21/2009 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* 1) 2ND FLOOR EXTERIOR WALL PROGRESS AREA |
12/21/2009 | EXT METAL CLIPS/EXT SHEATHING | AQUIROZ | Approved | IVRS - Inspection :* 1) 1ST FLOOR DENSGLASS |
12/22/2009 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* 1) OK ROUGH 1ST FLOOR FROM SOUTH BLDG WALL 2) APTS TO COMPUTER ROOM |
04/20/2010 | PLUMBING - ROOF DRAINS | RMYERS | Approved | IVRS - Inspection :* |
04/20/2010 | PLUMBING - ROOF DRAINS | IVR USER | Approved | IVRS - RI canceled |
06/10/2010 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* 1) YOU HAVE BEEN REPEATEDLY ASKED TO LEAVE A NAME AND CONTACT NUMBER WHEN SCHEDULING THIS INSPECTION. THE INSPECTOR DOES NOT HAVE TIME TO WALK ALL SIX FLOORS LOOKING FOR THE PLUMBER 2) PENTHOUSE DWV THRU ROOF OK, WATER TEST OK |
06/18/2010 | ROOF NAILING | LHANLY | Approved | |
07/19/2010 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER D. SANTACRUZ |
08/06/2010 | FIREWALL/FIREBARRIER/FIRESTOP | LHANLY | Approved | |
08/06/2010 | U VALUE FOR WINDOW | LHANLY | Approved | |
08/06/2010 | STUCCO MESH | LHANLY | Approved | |
09/07/2010 | BUILDING ABOVE CEILING | LHANLY | Approved | |
10/12/2010 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
10/13/2010 | MECHANICAL - PROGRESS | MRAMBER | Approved | IVRS - Inspection :* |
10/13/2010 | MECHANICAL - HOODS | MRAMBER | Approved | IVRS - Inspection :* |
10/13/2010 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
10/13/2010 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
10/14/2010 | PLUMBING - PROGRESS | RMYERS | Approved | IVRS - Inspection :* |
10/14/2010 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* |
11/01/2010 | PLUMBING - PRE SLAB | LHANLY | Approved | |
11/04/2010 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | |
11/04/2010 | ELECTRIC - PROGRESS | DSANTACR | Approved | |
11/04/2010 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | |
11/04/2010 | ELECTRIC - CABLE DROP | DSANTACR | Approved | |
11/04/2010 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | |
11/04/2010 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | |
11/04/2010 | ELECTRIC - UFER | DSANTACR | Approved | |
11/08/2010 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection :* 1) INSPECTOR UNABLE TO FIND ON PLAN WHERE CONDENSATES TERMINATE AT LAVATORY 2) EXTEND CLEANOUTS TO FACE OF WALL WHERE FIRE CAULKING IS REQUIRED 3) DISHWASHER DRAIN HOSE 4) BACKFLOW CERTS 5) STERILIZATION CLEAN BACTERIA REPORT |
11/08/2010 | PLUMBING - BACK WATER VALVE | RMYERS | Approved | IVRS - Inspection :* |
11/08/2010 | PLUMBING - GAS PRESS TEST FNL | RMYERS | Approved | IVRS - Inspection :* |
11/08/2010 | PLUMBING - GAS PRESSURE TEST | RMYERS | Approved | IVRS - Inspection :* |
11/08/2010 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection :* |
11/09/2010 | FIRE - ALARM FINAL | CSCHULTZ | Approved | |
11/09/2010 | ELECTRIC - FINAL | LHANLY | Approved | |
11/09/2010 | BUILDING - PROGRESS | LHANLY | Approved | |
11/12/2010 | FIRE - FINAL | CSCHULTZ | Approved | APPROVED |
11/12/2010 | FIRE - FINAL | CSCHULTZ | Approved | 1. Weather proof electrical on roof over exit door southeast stairwell. 2. Recoat fire proofing on I-beams west stairwell in the following areas: a. 6th floor 2nd landing b. 5th floor landing c. 3rd floor landing above exit door 3. Need to have all access roadways done |
11/12/2010 | MECHANICAL - FINAL | LHANLY | Approved | |
11/12/2010 | PLUMBING - FINAL | LHANLY | Approved | |
11/12/2010 | OUTDOOR LIGHTING FINAL | LHANLY | Approved | |
11/18/2010 | NPPO - FINAL | DROBERTS | Approved | |
11/18/2010 | NPPO - FINAL | DROBERTS | Approved | CONTRACTOR NOT AVAILABLE WILL INSPECT LATER TODAY OR TOMORROW WHEN TIME ALLOWS. |
11/18/2010 | SIGN - FINAL | JYBARRA | Approved | |
11/30/2010 | LANDSCAPE - FINAL | MRUSSO | Approved | |
11/30/2010 | ENGINEERING - FINAL | MRUSSO | Approved | |
12/06/2010 | BUILDING - FINAL | RLEIGH | Approved | |
12/06/2010 | RIGHT OF WAY - FINAL | RLEIGH | Approved |