Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T08CM02395
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/14/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
09/27/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) RAIN WATER LEADER TO CURB OK |
|
07/21/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 6TH FLOOR SHOWER PANS OK 2) 6TH FLOOR TRAP PRIMERS OK |
|
07/16/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) CONSTRUCTION SITE HOSE BIB TO HAVE APPROVED BACKFLOW PROTECTION 2) PENT HOUSE RAIN LEADERS AND RAIN LEADERS AND DRAINS ABOVE 6TH FLOOR OK |
|
07/13/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 6TH FLOOR INSULATION OK |
|
07/07/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 6TH FLOOR PEX OK TO INSULATE 2) OK TO COVER SHAFT AT SHOWER VALVE AFTER INSULATION 3) RECALL 03035 AFTER INSULATION |
|
07/06/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) SHOWER PANS ON 5TH FLOOR TEST OK |
|
06/24/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 4TH LEVEL WATER TEST SHOWER PANS |
|
06/23/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
06/16/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 3RD FLOOR SHOWER PANS OK |
|
06/09/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) LOST TEST |
|
06/08/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 2ND FLOOR SHOWERS OK |
|
06/03/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 6TH FLOOR DWV, N/H AND ABS THRU THE ROOF OK 2) WATER TEST OK 3) 6TH FLOOR EAST SIDE ROOF DRAINS AND DECK DRAINS OK |
|
05/27/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) LEVEL 1 ALL (4) SHOWER PANS WATER TEST |
|
05/26/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) SHOWER DIVERTER VALVES 1ST THRU 5TH FLOORS INSTALLED |
|
04/22/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 5TH FLOOR PEX AND COPPER OK |
|
04/20/2010 | PLUMBING - INTERMEDIATE | Cancelled | IVRS - RI canceled | |
04/20/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) ROOF DRAINS OK 2) PEX 4TH FLOOR OK 3) STILL NEED TO SEE SHOWERS |
|
04/15/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) DWV WATER TEST ONLY 4TH & 5TH EXCEPT ROOMS #407, 408 + ABOVE + LAUNDRY |
|
03/30/2010 | PLUMBING - INTERMEDIATE | Partial Approval | 1) 3RD FLOOR PEX OK 2) HOT INSULATION OK 3) STILL NEED TO SEE SHOWERS (ALL FLOORS) |
|
03/22/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
03/22/2010 | PLUMBING - INTERMEDIATE | Partial Approval | 2ND FLOOR COPPER AND PEX OK | |
03/16/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 2ND AND 3RD FLOOR N/H DWV OK 2) CONTRACTOR TO ADD HORIZONTAL AND VERTICAL SUPPORTS AS NEEDED |
|
03/09/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) RECEIVED AND ACCEPTED LETTER FROM ENGINEER REGARDING INSULATION |
|
03/02/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) ROOF DRAINS TO 3RD FLOOR OK |
|
03/01/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 1ST FLOOR MAIN COLD WATER IN WALL AND 1ST FLOOR ROOM (ONLY) 2) COMPLETE SHOWER VALVES IN 1ST FLOOR ROOMS 3) COMPLETE LIST FROM 2/22/10 |
|
02/22/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) B-1 UNDER FLOOR AND 1ST POUR, N/H DWV OK AND WATER TEST OK 2) PER 2006 IECC ALL HOT AND HOT RETURN TO BE INSULATED 3) PROVIDE SPECS FOR REQUIRED MATERIAL TYPE |
|
11/19/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) N/H RISERS AT ELEVATOR SHAFT AND AT SOUTH END OK TO INFILL CMU BLOCK |