Permit Details

Status:
Final
Type:
COMMERCIAL NEW
Apply Date:
10/02/2002
Applicant:
METRO PERMIT EXPRESS, INC
Description:
NEW:OFFICE BUILDING (SHELL)
Contractors:
  • TRIUMPH BUILDERS SOUTHWEST LLC *C*

Permit Reviews

Permit Number - T02CM04617
Permit Status: Final
Permit Description: NEW:OFFICE BUILDING (SHELL)
Start Date Submittal Complete Date Status  
01/17/2003 REVISION 02/11/2003 COMPLETED Review Details
01/22/2003 REVISION 03/05/2003 COMPLETED Review Details
02/27/2003 REVISION 03/27/2003 COMPLETED Review Details
03/26/2003 REVISION 03/26/2003 COMPLETED Review Details
04/16/2003 3RD PARTY REVIEW-REVISION/OTHER 04/23/2003 COMPLETED Review Details
04/29/2003 3RD PARTY REVIEW-REVISION/OTHER 06/05/2003 COMPLETED Review Details
06/03/2003 3RD PARTY REVIEW-REVISION/OTHER 09/26/2003 COMPLETED Review Details
10/02/2002 3RD PARTY REVIEW-COMMERCIAL 11/26/2002 COMPLETED Review Details
11/25/2002 RESUBMITTAL 11/27/2002 COMPLETED Review Details
11/25/2002 SITE 11/27/2002 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T02CM04617
Permit Status: Final
Permit Description: NEW:OFFICE BUILDING (SHELL)
Total Outstanding Activity Conditions - 1
Date Name
10/02/2002 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T02CM04617
Permit Description: NEW:OFFICE BUILDING (SHELL)
Total Completed Inspections - 41
Date Description Inspector Results Comments
12/12/2002 EXCAVATION/LAYOUT REBAR & ZON RSUBA Approved IVRS - Inspection 0000*FOUNDATION/STEM WALL BUILDING.
12/17/2002 PLUMBING - SEWER HCS CONNECT TRINIVJR Approved HAD A PRE CONSTRUCTION MEETING ON SITE SEWER & CUT.
12/30/2002 REINFORCED MASONRY PRE-GROUT HLEYVA Approved IVRS - Inspection 0000*OK TO 12' @ STAIR NORTH WELL T0 4' @ ELEVATOR SHAFT.
02/20/2003 PLUMBING - ROUGH, SOIL TRINIVJR Approved IVRS - Inspection 0000*SOIL WATER TEST FOR 2" WASTE FOR SUMP PUMP IS OK
2.) OK TO BACKFILL TRENCH.
03/04/2003 ROOF NAILING LHANLY Approved IVRS - Inspection 0000*REPAIR MONKOTE @ FIRST FLOOR LINE 2.
03/04/2003 BUILDING PRE-SLAB LHANLY Approved IVRS - Inspection 0000*MISSING SECTION TO BE DONE ON TI PERMIT.
04/08/2003 EXT METAL CLIPS/EXT SHEATHING LHANLY Approved IVRS - Inspection 0000*2ND FLOOR CHASE DO NOT COVER INSIDE UNTIL FIRE STOP IN PLACE.
04/18/2003 PLUMBING - INTERMEDIATE TRINIVJR Approved IVRS - Inspection 0000*GAS PRESSURE TEST IS OK
2.) AIR PRESSURE TEST FOR OVERHEAD WATER DISTRIBUTION IS OK.
05/09/2003 SHEET ROCK NAILING LHANLY Approved IVRS - Inspection 0000*
05/09/2003 FRAMING LHANLY Approved IVRS - Inspection 0000*
05/13/2003 PLUMBING - YARD WTR LINE/TEST RMYERS Approved 1.) WATER SYSTEM LINE PRESSURE TESTED
2.) FINAL CONNECTION BETWEEN METER AND RPPBP OK WILL NEED CERTIFICATION ON FINAL OK TO COVER.
05/15/2003 MECHANICAL - TEMP PWR FOR TEST JMILITEL Approved IVRS - Inspection 0000*
05/15/2003 PLUMBING - TEMP POWER FOR TEST TRINIVJR Approved IVRS - Inspection 0000*OK TO BACKFILL AROUND S.E. SYSTEM
2.) OK FOR TEMP POWER.
05/15/2003 BUILDING - TEMP POWER FOR TEST LHANLY Approved IVRS - Inspection 0000*
05/23/2003 ELECTRIC - TEMP POWER FOR TEST JORTA Approved
05/23/2003 ELECTRIC - CABLE DROP JORTA Approved IVRS - Inspection 0000*
06/03/2003 U VALUE FOR WINDOW LHANLY Approved IVRS - Inspection 0000*
06/03/2003 BUILDING ABOVE CEILING LHANLY Approved IVRS - Inspection 0000*/ 1) FOR OFFICE ROOMS/OTHER AREAS TO BE DONE ON TI
06/12/2003 RIGHT OF WAY - FINAL LLOPEZ Approved
06/19/2003 PLUMBING - FINAL TRINIVJR Approved 1) MENS & WOMENS RESTROOM ARE IN WORKING ORDER 2) OK FOR TEMP C OF O.
06/19/2003 PLUMBING - ROOF DRAINS TRINIVJR Approved
06/19/2003 PLUMBING - ABOVE CEILING TRINIVJR Approved
06/19/2003 OUTDOOR LIGHTING FINAL JORTA Approved IVRS - Inspection 0000*
06/23/2003 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
06/23/2003 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
06/25/2003 FIRE - FINAL LTHOMAS Approved TEMPORARY C OF O ONLY. NO PUBLIC IN BUILDING UNTIL FIRE PROTECTION SYSTEMS ARE FINISHED AND APPROVED.
06/25/2003 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
06/26/2003 FIRE SPKLR - FINAL JEGAN Approved IVRS - Inspection 0000*
07/23/2003 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection 0000*/ 1) OK FOR C OF O
07/23/2003 MECHANICAL - ABOVE CEILING JMILITEL Approved
07/23/2003 MECHANICAL - INTERMEDIATE JMILITEL Approved
08/06/2003 NPPO - FINAL PGILBERT Approved
08/06/2003 LANDSCAPE - FINAL PGILBERT Approved DUST CONTROL. STREET LS. BORDER/SCREEN NOT COMPLETE ON WILLIAMS BLDV & COOPER ST. PHASING PLAN DOES NOT ADDRESSTHIS ( IS IT OKAY? NEED TO SPEAK WITH C GROSS.
08/06/2003 ELECTRIC - FINAL JORTA Approved IVRS - Inspection 0000*
08/06/2003 ELECTRIC - ABOVE CEILING JORTA Approved
08/06/2003 ELECTRIC - INTERMEDIATE JORTA Approved
08/06/2003 ELECTRIC - UNDERGROUND JORTA Approved
08/06/2003 ELECTRIC - UFER JORTA Approved
09/05/2003 ENGINEERING - FINAL DROBERTS Approved
09/24/2003 BUILDING - FINAL LHANLY Approved IVRS - Inspection 0000*
10/06/2003 SIGN - FINAL DJOHNSTO Approved ADDRESS CHANGED TO 250 S CRAYCROFT

Documents

File Name Document Type  
None DOCUMENTS VIEW