Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
Permit Number - T02CM04617
Inspection Description - PLUMBING - SEWER HCS CONNECT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/05/2003 | PLUMBING - SEWER HCS CONNECT | Approved | IVRS - Inspection 0000*/ 1) FINAL CONNECTION TO BLDG DRAIN IS OK | |
05/30/2003 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection 0000* | |
05/16/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000* | |
05/15/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000* | |
05/14/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*MIKE #440-7441. DRAIN LINE FOR DRY WELL OK TO BACK FILL PLEASE PROVIDE REVISED APPROVED PLANS ON LIFT STATION RED LINE ON JOB. |
|
05/12/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*1.) 6" BLDG. SEWER PENETRATION FOR E.S. IS OK 2.) OK TO BACKFILL TRENCH. |
|
04/24/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1.) 6" SITE SEWER FOR BLDG. #3 IS OK FOR BACKFILL. 2.) WILL VERIFY AIR PRESSURE TEST @ LATER TIME 3.) FINAL CONNECTION OF BLDG. SEWER TO INTERCEPTOR IS OK. |
|
04/21/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000* 1.) 6" SITE SEWER FROM S.E. SYSTEM TO INTERCEPTOR IS OK 2.) 4" FORCED MAIN FROM S.E. SYSTEM TO NEW M.H. IS OK 3.) OK TO BACKFILL TRENCH. 4.) MUST SEE FINAL CONNECTION TO INTERCEPTOR. |
|
12/17/2002 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | HAD A PRE CONSTRUCTION MEETING ON SITE SEWER & CUT. |