Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
6720 S ALVERNON WY
Apply Date:
03/12/2012
Applicant:
Description:
SITE/GRADING FOR WAREHOUSE W/PARKING AND TRUCK COURT

Permit Reviews

Permit Number - DP12-0033
Permit Status: Complete
Permit Description: SITE/GRADING FOR WAREHOUSE W/PARKING AND TRUCK COURT
Start Date Submittal Complete Date Status  
03/12/2012 DEV PKG - OK TO SUBMIT 03/12/2012 COMPLETED Review Details
03/12/2012 SITE 03/27/2012 COMPLETED Review Details
03/27/2012 RESUB - SITE/GRADING ALL 04/04/2012 COMPLETED Review Details
04/04/2012 RESUB - SITE/GRADING ALL 04/06/2012 COMPLETED Review Details
06/01/2012 REVISION - SITE 06/01/2012 COMPLETED Review Details
06/01/2012 REVISION - SITE 07/31/2012 COMPLETED Review Details
08/22/2013 REVISION - GRADING 10/11/2013 COMPLETED Review Details
09/17/2012 REVISION - SITE 09/26/2012 COMPLETED Review Details
09/26/2012 REVISION - SITE 10/01/2012 COMPLETED Review Details
10/01/2012 REVISION - SITE 10/24/2012 COMPLETED Review Details
10/11/2013 REVISION - GRADING 10/18/2013 COMPLETED Review Details
10/18/2013 REVISION - GRADING 09/05/2014 COMPLETED Review Details

Conditions

Permit Number - DP12-0033
Permit Status: Complete
Permit Description: SITE/GRADING FOR WAREHOUSE W/PARKING AND TRUCK COURT
Date Description Comments
04/04/2012 The following 9 conditions apply to grading permit DP12-0033:1)Variance or DSMR's may be required for any proposed changes. 2)Erosion protection for areas of erosion shall be provided as rip rap with filter fabric unless EOR provides revised grading plan sheets submitted for review.3)Max slope grade (max 2:1(H:V) per geotechnical recommendation) for proposed slopes.4)No CofO will be issued until all offsite improvements shall be completed. Contact PC DOT for Pima County right-of-way improvement permits and inspections.5)Prior to intermediate inspections, detail F-F sheet 10 shall be submitted for this slope design as part of a revision to provide conformance to geotechnical report. Geotechnical addendum may be required. 6)Prior to intermediate inspections, detail with dimensions shall be provided for outlet spillway for basin. 7)Prior to intermediate inspections, detail 8 on sheet 9, shall be corrected to reflect freeboard provided for top of rip rap.8)Provide concrete header along curb returns at entrances. 9)CD of the final approved drainage report may be provided at as-built stage.
04/04/2012 The following 9 conditions apply to grading permit DP12-0033:1)Variance or DSMR's may be required for any proposed changes. 2)Erosion protection for areas of erosion shall be provided as rip rap with filter fabric unless EOR provides revised grading plan sheets submitted for review.3)Max slope grade (max 2:1(H:V) per geotechnical recommendation) for proposed slopes.4)No CofO will be issued until all offsite improvements shall be completed. Contact PC DOT for Pima County right-of-way improvement permits and inspections.5)Prior to intermediate inspections, detail F-F sheet 10 shall be submitted for this slope design as part of a revision to provide conformance to geotechnical report. Geotechnical addendum may be required. 6)Prior to intermediate inspections, detail with dimensions shall be provided for outlet spillway for basin. 7)Prior to intermediate inspections, detail 8 on sheet 9, shall be corrected to reflect freeboard provided for top of rip rap.8)Provide concrete header along curb returns at entrances. 9)CD of the final approved drainage report may be provided at as-built stage.
04/04/2012 The following 9 conditions apply to grading permit DP12-0033:1)Variance or DSMR's may be required for any proposed changes. 2)Erosion protection for areas of erosion shall be provided as rip rap with filter fabric unless EOR provides revised grading plan sheets submitted for review.3)Max slope grade (max 2:1(H:V) per geotechnical recommendation) for proposed slopes.4)No CofO will be issued until all offsite improvements shall be completed. Contact PC DOT for Pima County right-of-way improvement permits and inspections.5)Prior to intermediate inspections, detail F-F sheet 10 shall be submitted for this slope design as part of a revision to provide conformance to geotechnical report. Geotechnical addendum may be required. 6)Prior to intermediate inspections, detail with dimensions shall be provided for outlet spillway for basin. 7)Prior to intermediate inspections, detail 8 on sheet 9, shall be corrected to reflect freeboard provided for top of rip rap.8)Provide concrete header along curb returns at entrances. 9)CD of the final approved drainage report may be provided at as-built stage.

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0033
Permit Description: SITE/GRADING FOR WAREHOUSE W/PARKING AND TRUCK COURT
Total Completed Inspections - 13
Date Description Inspector Results Comments
04/13/2012 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/13/2012; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - KIM MOYER AND BRYCE HALL AT PER CON MEETING. PROVE NOI AND SWPPP CONTOLS AND INFO AT GATE.}
05/04/2012 SITE - Stormwater Setup and Controls Passed {Activity date: 05/04/2012; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/21/2012 Final inspection to ensure all landscape and water harvesting SITE Passed {Activity date: 12/21/2012; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/21/2012 SITE Passed {Activity date: 12/21/2012; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/29/2013 SITE - SWPPP Correction Notice Passed {Activity date: 08/29/2013; Status: Approved; Inspector: ELEIBOL1; Comment: Entered by ELEIBOL1 - Field conditions ok - waiting for sealed substantial completion docs.} ; {Activity date: 07/03/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TRACK OUT ROCK HAS BEEN ADDED.} ; {Activity date: 06/29/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH STEVE TO PROVIDE TRACK OUT ROCK. BY MONDAY.} ; {Activity date: 06/19/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STREETS HAVE BEEN CLEANED.} ; {Activity date: 06/15/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GRADING CONTRACTOR ABOUT CLEANING TRACK OUT OFF STREET.}
08/29/2013 TRSP - ROW - Final/Close-Out Passed {Activity date: 08/29/2013; Status: Approved; Inspector: ELEIBOL1; Comment: Entered by ELEIBOL1 - PC ROW letter was provided indicating acceptance by PC ROW for project.} ; {Activity date: 04/04/2012; Status: Prior to Intermediates; Inspector: eleibol1; Comment: Entered by ELEIBOL1 - Special inspection by Pima County DOT required for ROW improvements.}
08/29/2013 SITE - Stormwater Follow-up Passed {Activity date: 08/29/2013; Status: Approved; Inspector: ELEIBOL1; Comment: Entered by ELEIBOL1 - Field conditions ok - waiting for sealed substantial completion docs.} ; {Activity date: 09/17/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT NO GRADING ACTIVITY.} ; {Activity date: 07/24/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO GRADING WORK AT THIS TIME.} ; {Activity date: 07/20/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NEW ROCK ADDED AT ENTRANCE ON TRACK OUT.} ; {Activity date: 07/17/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 05/16/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 05/14/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SWPPP AT GATE HAS BEEN INSTALLED. AND NPPO PROTECTION ALSO INSTALLED.} ; {Activity date: 05/11/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SWPPP INFO STILL NOT UP AT . NPPOS PIPS NOT PROTECTED.} ; {Activity date: 04/20/2012; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED OVER THE SITE TO SEE THAT THEY HAVE INSTALLED THE CONTROLS AS NEEDED AT THIS TIME. CURRENTLY THEY ARE USING GRADER DITCHES IN LIEU OF WADDLE OR SILT FENCE, THESE CHANGES WILL BE NOTED ON THE SWPPP PLAN LOCATED ON SITE. THERE APPEARS TO BE NO CONCERNS AT THIS TIME.}
08/29/2013 ENGR Grading Final Passed {Activity date: 08/29/2013; Status: Approved; Inspector: ELEIBOL1; Comment: Entered by ELEIBOL1 - PCRWRD provided approval letter dated Feb 11 2013.} ; {Activity date: 11/30/2012; Status: Continued; Inspector: ELEIBOL1; Comment: Entered by GBONILL1 - Inspector at site - inquiry regarding lime to be applied along sewer line area - contractor wants to delete this item. I stated that PCRWRD will have to provide a document stating that lime was not needed, at minimum at as-built stage.
- Elizabeth}
08/29/2013 SITE - Stormwater Final Inspection Passed {Activity date: 08/29/2013; Status: Approved; Inspector: ELEIBOL1; Comment: Entered by ELEIBOL1 - }
10/15/2013 ENGR Engineering Final Passed {Activity date: 10/15/2013; Status: Approved; Inspector: eleibol1; Comment: Entered by ELEIBOL1 - NPPO Monitoring Report was submitted. Properly sealed Substantial Completion letters (for project as-built and drainage facilities), as-built sheets were provided and accepted for Final Engineering Approval. Per discussions with Inspector, loading dock area and trench drain was cleaned out at last inspection.} ; {Activity date: 12/21/2012; Status: Denied; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE CERT LETTER FROM ENGINEER OF RECORD FOR GRADING AND DRIANAGE. COMPLET LANDSCAPING PROVIDE NPPO REPORT. CLEAN TRECH DRAIN IN AND OUT SIDE LOADING DOCK.}
06/10/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/10/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/05/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/05/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/20/2012; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED OVER THE SITE AFTER MEETING WITH THE CONTRACTOR ABOUT THE PLACEMENT OF PLANT MATERIAL IN AN ONSITE NURSARY. I WILL HAVE RON VARIFY THAT ALL OF THE MATERIAL HAS BEEN PLACED WITHIN THE NURSARY THAT IS GOING TO BE DISTURBED. I HAVE BEEN ADVISED BY THE CONTRACTOR THAT THERE ARE SOME PLANTS THAT HAVE NOT BEEN PLACED INTO THE NURSARY BECAUSE THEY DID NOT NEED TO BE REMOVED, THEY ARE IN AREAS THAT ARE NOT SUPPOSE TO BE DISTURBED.}
08/05/2020 COT - FCON - Fire - Final Passed {Activity date: 08/05/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET .TIF DEVPLANS VIEW
002_SPECS.TIF DEVPLANS VIEW
003_EXISTING CONDITIONS.TIF DEVPLANS VIEW
004_SITE PLAN.TIF DEVPLANS VIEW
005_GRADING PLAN.TIF DEVPLANS VIEW
006_UTILITY PLAN.TIF DEVPLANS VIEW
007_SEWER.TIF DEVPLANS VIEW
005_SEWER PROFOLE_SHEET 6A OF 16.TIF DEVPLANS VIEW
008_DETAIL SHEET.TIF DEVPLANS VIEW
009_DETAIL SHEET.TIF DEVPLANS VIEW
010_SITE SECTIONS.TIF DEVPLANS VIEW
011_SWPPP.TIF DEVPLANS VIEW
012_LANDSCAPE PLAN.TIF DEVPLANS VIEW
013_IRRIGATION PLAN.TIF DEVPLANS VIEW
014_WATER HARVERSTING.TIF DEVPLANS VIEW
015_NATIVE PLANT PRESERVATION.TIF DEVPLANS VIEW
016_NATIVE PLANT PRESERVATION.TIF DEVPLANS VIEW
CASH BOND 2012_04_03.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW