Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/29/2013 |
ENGR Engineering Final
|
ELEIBOL1 |
Approved |
Entered by ELEIBOL1 - Field conditions ok - waiting for sealed substantial completion docs. |
| 12/07/2012 |
ENGR Engineering Final
|
RLEDONNE |
Denied |
Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS AND NOTES FROM PAST INSPECTIONS. |
| 10/15/2013 |
ENGR Engineering Final
|
eleibol1 |
Approved |
Entered by ELEIBOL1 - NPPO Monitoring Report was submitted. Properly sealed Substantial Completion letters (for project as-built and drainage facilities), as-built sheets were provided and accepted for Final Engineering Approval. Per discussions with Inspector, loading dock area and trench drain was cleaned out at last inspection. |
| 12/21/2012 |
ENGR Engineering Final
|
RLEDONNE |
Denied |
Entered by RLEDONN1 - PROVIDE CERT LETTER FROM ENGINEER OF RECORD FOR GRADING AND DRIANAGE. COMPLET LANDSCAPING PROVIDE NPPO REPORT. CLEAN TRECH DRAIN IN AND OUT SIDE LOADING DOCK. |