Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - NPPO
| Date |
Description |
Inspector |
Results |
Comments |
| 06/10/2020 |
PDSD Site/Engineering Division - NPPO |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/21/2013 |
PDSD Site/Engineering Division - NPPO |
ACONNOR |
Correction Required |
Entered by ACONNOR1 - Monitoring report received on 10/02/13. Prior to Landscape and NPPO final inspection approval necessary. All NPPO issues per landscape architect must be addressed. Monitoring reports can be found S:\Landscape Section\Monitoring Reports & Letters of Completion |
| 08/05/2020 |
PDSD Site/Engineering Division - NPPO |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/20/2012 |
PDSD Site/Engineering Division - NPPO |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - LOOKED OVER THE SITE AFTER MEETING WITH THE CONTRACTOR ABOUT THE PLACEMENT OF PLANT MATERIAL IN AN ONSITE NURSARY. I WILL HAVE RON VARIFY THAT ALL OF THE MATERIAL HAS BEEN PLACED WITHIN THE NURSARY THAT IS GOING TO BE DISTURBED. I HAVE BEEN ADVISED BY THE CONTRACTOR THAT THERE ARE SOME PLANTS THAT HAVE NOT BEEN PLACED INTO THE NURSARY BECAUSE THEY DID NOT NEED TO BE REMOVED, THEY ARE IN AREAS THAT ARE NOT SUPPOSE TO BE DISTURBED. |