Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP12-0033
Parcel: 14041127A

Review Status: Completed

Review Details: RESUB - SITE/GRADING ALL

Permit Number - DP12-0033
Review Name: RESUB - SITE/GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/04/2012 MARTIN BROWN FIRE REVIEW Approved
04/04/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
04/04/2012 ELEIBOL1 ENGINEERING REVIEW Approv-Cond TO: Jim Roth, P.E., COLE Engineering
SUBJECT: Tire Warehouse Development Package 3rd submittal Engineering Review
ADDRESS: 6720 S ALVERNON WY 85756, Ward 5
LOCATION: T15S R14E Section 16
FLOODPLAIN: FEMA zone X, 2293L
REVIEWER: Elizabeth Leibold, P.E.
ACTIVITY NUMBER: DP12-0033

SUMMARY: Engineering has reviewed the revised Development Package, revised Proposed Warehouse Drainage Report, revised SWPPP, and response letter, and recommends approval of the Development Package and the Drainage Report, pending the following items to be submitted prior to picking up grading permit. Please address the permit conditions during grading construction.

CONDITIONAL APPROVAL COMMENTS:
1) Items that the Applicant or Contractor would need to provide for grading permit issuance:
a) Submit missing sheets 15 & 16 of plan set.
b) (Reseeding bond $17,968.50 submitted 3APR12)
c) Any remaining fees - this amount should be available after the review is completed and approvals are provided.
d) DEQ air quality permit - front counter Permit Clerks will make a copy and need the DEQ #.
e) Documentation from owner authorizing named contractor(s) to work on the portion of the parcel as shown on the approved plans DP12-0033, if lot split paperwork is not provided.
f) Contractor License - if not Arizona licensed, provide Bond Exemption Certificate.
g) Any additional documentation as determined from Reviewers, including sewer capacity letter.

GRADING PERMIT CONDITIONS:
The following 9 conditions apply to grading permit DP12-0033:
1) Variance or DSMR's may be required for any proposed changes.
2) Erosion protection for areas of erosion shall be provided as rip rap with filter fabric unless EOR provides revised grading plan sheets submitted for review.
3) Max slope grade (max 2:1(H:V) per geotechnical recommendation) for proposed slopes.
4) No CofO will be issued until all offsite improvements shall be completed. Contact PC DOT for Pima County right-of-way improvement permits and inspections.
5) Prior to intermediate inspections, detail F-F sheet 10 shall be submitted for this slope design as part of a revision to provide conformance to geotechnical report. Geotechnical addendum may be required.
6) Prior to intermediate inspections, detail with dimensions shall be provided for outlet spillway for basin.
7) Prior to intermediate inspections, detail 8 on sheet 9, shall be corrected to reflect freeboard provided for top of rip rap.
8) Provide concrete header along curb returns at entrances.
9) CD of the final approved drainage report may be provided at as-built stage.

If you have questions, call me at 837-4934.

Elizabeth Leibold, P.E., CPM, CFM
Civil Engineer
Engineering Division, Planning & Development Services Department
City of Tucson
04/04/2012 RONALD BROWN H/C SITE REVIEW Approved
04/04/2012 ELEIBOL1 ENGINEERING REVIEW Approv-Cond TO: Jim Roth, P.E., COLE Engineering
SUBJECT: Tire Warehouse Development Package 3rd submittal Engineering Review (updated 5APR12)
ADDRESS: 6720 S ALVERNON WY 85756, Ward 5
LOCATION: T15S R14E Section 16
FLOODPLAIN: FEMA zone X, 2293L
REVIEWER: Elizabeth Leibold, P.E.
ACTIVITY NUMBER: DP12-0033

SUMMARY: Engineering has reviewed the revised Development Package, revised Proposed Warehouse Drainage Report, revised SWPPP, and response letter, and recommends approval of the Development Package and the Drainage Report, pending the following items to be submitted prior to picking up grading permit. Reseeding bond $17,968.50 submitted 3APR12, PC DOT approval received 5APR12, and Capacity Letter for PCRWRD received 5APR12. Please address the permit conditions during grading construction.

CONDITIONAL APPROVAL COMMENTS:
1) Items that the Applicant or Contractor would need to provide for grading permit issuance:
a) Submit missing sheets 15 & 16 of plan set.
b) Any remaining fees - this amount should be available after the review is completed and approvals are provided.
c) DEQ air quality permit - front counter Permit Clerks will make a copy and need the DEQ #.
d) Contractor License - if not Arizona licensed, provide Bond Exemption Certificate.
e) Any additional documentation as determined from Reviewers.

GRADING PERMIT CONDITIONS:
The following 9 conditions apply to grading permit DP12-0033:
1) Variance or DSMR's may be required for any proposed changes.
2) Erosion protection for areas of erosion shall be provided as rip rap with filter fabric unless EOR provides revised grading plan sheets submitted for review.
3) Max slope grade (max 2:1(H:V) per geotechnical recommendation) for proposed slopes.
4) No CofO will be issued until all offsite improvements shall be completed. Contact PC DOT for Pima County right-of-way improvement permits and inspections.
5) Prior to intermediate inspections, detail F-F sheet 10 shall be submitted for this slope design as part of a revision to provide conformance to geotechnical report. Geotechnical addendum may be required.
6) Prior to intermediate inspections, detail with dimensions shall be provided for outlet spillway for basin.
7) Prior to intermediate inspections, detail 8 on sheet 9, shall be corrected to reflect freeboard provided for top of rip rap.
8) Provide concrete header along curb returns at entrances.
9) CD of the final approved drainage report may be provided at as-built stage.

If you have questions, call me at 837-4934.

Elizabeth Leibold, P.E., CPM, CFM
Civil Engineer
Engineering Division, Planning & Development Services Department
City of Tucson
04/05/2012 STEVE SHIELDS ZONING REVIEW Approved
04/06/2012 JOE LINVILLE NPPO REVIEW Approved
04/06/2012 JOE LINVILLE LANDSCAPE REVIEW Approved