Permit: TR-UTL-1224-02341
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4431 E 22ND ST
Address NEW:
4431 E 22ND ST
Apply Date:
12/11/2024
Applicant:
Bryan Justice
Description:
Utility (sewer) work to be performed in ROW. 01/15/2025 - Renewed for 60 days from 01/18/2025 to 03/18/2025.
Permit Reviews
Permit Number - TR-UTL-1224-02341
Permit Status: Complete
Permit Description: Utility (sewer) work to be performed in ROW.
01/15/2025 - Renewed for 60 days from 01/18/2025 to 03/18/2025.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/12/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02341
Permit Status: Complete
Permit Description: Utility (sewer) work to be performed in ROW.
01/15/2025 - Renewed for 60 days from 01/18/2025 to 03/18/2025.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/13/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 12/13/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02341
Permit Description: Utility (sewer) work to be performed in ROW.
01/15/2025 - Renewed for 60 days from 01/18/2025 to 03/18/2025.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/29/2025 | TRSP - ROW - Final | Passed | ||
| 08/29/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed |