Permit Details

Status:
Complete
Type:
Commercial Building
Address:
4431 E 22ND ST
Address NEW:
4431 E 22ND ST
Apply Date:
05/13/2025
Applicant:
Kelly Rehm
Description:
Parking Canopy - P2 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas.

Permit Reviews

Permit Number - TC-COM-0525-00987
Permit Status: Complete
Permit Description: Parking Canopy - P2 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas.
Start Date Submittal Complete Date Status  
05/13/2025 COMMERCIAL REVIEW - FULL v.1 06/10/2025 APPROVED Review Details
06/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/16/2025 APPROVED Review Details
12/09/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/12/2025 APPROVED Review Details
06/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/12/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0525-00987
Permit Status: Complete
Permit Description: Parking Canopy - P2 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas.
Date Description Comments
05/13/2025 SPECIAL INSPECTION OF COLD-FORMED STEEL FRAMING IS REQUIRED
05/13/2025 SPECIAL INSPECTION OF FABRICATORS IS REQUIRED
06/16/2025 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
05/13/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
05/13/2025 SPECIAL INSPECTION OF STRUCTURAL STEEL IS REQUIRED

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0525-00987
Permite Description: Parking Canopy - P2 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/16/2025 BULD - Electrical Clearance N/A Not Applicable one meter sent on another permit.
12/16/2025 COT - FCON - Fire - Final N/A Partial Pass Rapid shut down signage shall be provided.
12/16/2025 ENGR Engineering Final N/A Not Ready 12/16/25
Concrete Pier at the north end is finished below grade in landscaped parking island. Not to plan.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0525-00987
Permit Description: Parking Canopy - P2 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas.
Total Completed Inspections - 6
Date Description Inspector Results Comments
12/16/2025 COT - CSOL - Electrical Underground Solar Project Passed
12/16/2025 COT - LCBU - Building Final Passed All work per approved plans.
12/16/2025 COT - LCEL - Electrical Final Passed per approved plans
12/16/2025 TRSP - ROW - Final/Close-Out Passed
12/17/2025 COT - FCON - Fire - Final Passed
01/22/2026 ENGR Engineering Final Passed