Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
08/23/2024
Applicant:
Gary Wellborn
Description:
The interior scope of work entails interior tenant improvement of 18,625 SF of existing office to be converted to a laboratory use. The laboratory use is for testing and is not a chemical laboratory space with hazardous chemical storage. New laboratory will include testing chambers, small bridge cranes, and other owner supplied equipment. Exterior work includes installation of a LN2 tank, associated concrete pad, and a 780 SF canopy structure. The new canopy is an extension of the existing canopy and will be added at southeast corner of building.

Permit Reviews

Permit Number - TC-COM-0824-01656
Permit Status: Complete
Permit Description: The interior scope of work entails interior tenant improvement of 18,625 SF of existing office to be converted to a laboratory use. The laboratory use is for testing and is not a chemical laboratory space with hazardous chemical storage. New laboratory will include testing chambers, small bridge cranes, and other owner supplied equipment. Exterior work includes installation of a LN2 tank, associated concrete pad, and a 780 SF canopy structure. The new canopy is an extension of the existing canopy and will be added at southeast corner of building.
Start Date Submittal Complete Date Status  
07/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/03/2025 REQUIRES RESUBMIT Review Details
03/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/18/2025 REQUIRES RESUBMIT Review Details
08/27/2024 COMMERCIAL REVIEW - FULL v.1 09/26/2024 REQUIRES RESUBMIT Review Details
11/18/2024 RESTAMP - COMMERCIAL v.1 11/21/2024 APPROVED Review Details
10/16/2024 COMMERCIAL REVIEW - FULL v.2 10/22/2024 REQUIRES RESUBMIT Review Details
11/08/2024 COMMERCIAL REVIEW - FULL v.3 11/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0824-01656
Permit Status: Complete
Permit Description: The interior scope of work entails interior tenant improvement of 18,625 SF of existing office to be converted to a laboratory use. The laboratory use is for testing and is not a chemical laboratory space with hazardous chemical storage. New laboratory will include testing chambers, small bridge cranes, and other owner supplied equipment. Exterior work includes installation of a LN2 tank, associated concrete pad, and a 780 SF canopy structure. The new canopy is an extension of the existing canopy and will be added at southeast corner of building.
Total Outstanding Activity Conditions - 13
Date Name
11/18/2024 AIR BALANCING REPORT IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
11/18/2024 Masonry Inspection Report submittal review is required.
11/18/2024 Post-Installed Anchor Inspection Report is required.
11/18/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
11/18/2024 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0824-01656
Permit Status: Complete
Permit Description: The interior scope of work entails interior tenant improvement of 18,625 SF of existing office to be converted to a laboratory use. The laboratory use is for testing and is not a chemical laboratory space with hazardous chemical storage. New laboratory will include testing chambers, small bridge cranes, and other owner supplied equipment. Exterior work includes installation of a LN2 tank, associated concrete pad, and a 780 SF canopy structure. The new canopy is an extension of the existing canopy and will be added at southeast corner of building.
Date Description Comments
08/27/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/19/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0824-01656
Permite Description: The interior scope of work entails interior tenant improvement of 18,625 SF of existing office to be converted to a laboratory use. The laboratory use is for testing and is not a chemical laboratory space with hazardous chemical storage. New laboratory will include testing chambers, small bridge cranes, and other owner supplied equipment. Exterior work includes installation of a LN2 tank, associated concrete pad, and a 780 SF canopy structure. The new canopy is an extension of the existing canopy and will be added at southeast corner of building.
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
11/29/2024 COT - HCBU - Framing N/A Partial Pass 11/29/24: framing per plan at perimeter walls at rooms 101,102,112,107,106. Pending east walls. Ok to insulate and drywall.
03/11/2025 COT - HCBU - Masonry Pregrout N/A Partial Pass 3/11/25: partial pass for infill at masonry wall ok to proceed.
07/24/2025 COT - HCPL - Gas Final N/A Not Applicable
03/27/2025 COT - HCEL - Electrical Intermediate N/A Partial Pass 1/21/25: electrical intermediate/ progress in Area A ( rough-in of all conduits/ gutter and trays) ok to proceed. Grounding of trays approved.
2/28/25: electrical intermediate / progress in Area C (rough-in of all conduits/ gutter and trays), grounding per plan ok to proceed.
3/27/25: transformers wired per plan ok to proceed,
07/24/2025 COT - HCPL - Gas Pressure Test N/A Not Applicable
05/01/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 5/1/25: reinforcement per plan at Bridge crane footings (4) in Area B and (4) in Area D. Ok to proceed with concrete placement.
05/01/2025 COT - HCBU - Preslab N/A Partial Pass 5/1/25: reinforcement per plan at Bridge crane footings (4) in Area B and (4) in Area D. Ok to proceed with concrete placement.
02/28/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass 2/28/25: chilled water supply and return per plan at Area A and C
02/28/2025 COT - HCME - Mechanical Intermediate N/A Partial Pass 1/21/25: Hard duct installed per plans in Area A, seal all connections with duct sealer, diffusers installed per plan. Ok to proceed.
2/28/25: Hard duct installed per plans in Area C, ok to proceed.
COT - FCON - Sprinkler - Final N/A Not Ready
COT - FCON - Alarm - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0824-01656
Permit Description: The interior scope of work entails interior tenant improvement of 18,625 SF of existing office to be converted to a laboratory use. The laboratory use is for testing and is not a chemical laboratory space with hazardous chemical storage. New laboratory will include testing chambers, small bridge cranes, and other owner supplied equipment. Exterior work includes installation of a LN2 tank, associated concrete pad, and a 780 SF canopy structure. The new canopy is an extension of the existing canopy and will be added at southeast corner of building.
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/27/2025 COT - HCBU - Framing Passed
03/27/2025 COT - HCBU - Masonry Pregrout Passed
07/24/2025 COT - HCPL - Plumbing Above Ceiling Passed
07/24/2025 COT - HCBU - Building Above Ceiling Passed
07/24/2025 COT - HCME - Mechanical Final Passed
07/24/2025 COT - HCEL - Electrical Intermediate Passed
07/24/2025 COT - HCEL - Electrical Above Ceiling Passed
07/24/2025 TRSP - ROW - Final/Close-Out Passed
07/24/2025 ENGR Engineering Final Passed Bollards installed per plan, spacing and hgt is correct.
07/24/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
07/24/2025 COT - HCBU - Preslab Passed
07/24/2025 COT - HCPL - Plumbing Final Passed
07/24/2025 COT - HCPL - Plumbing Intermediate Passed
07/24/2025 COT - HCEL - Electrical Final Passed
07/24/2025 COT - HCME - Mechanical Intermediate Passed
07/24/2025 COT - HCME - Mechanical Above Ceiling Passed
08/22/2025 COT - FCON - Sprinkler - Final Passed
08/25/2025 COT - HCBU - Building Final Passed
11/14/2025 COT - FCON - Alarm - Final Passed
11/14/2025 COT - FCON - Fire - Final Passed