Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Expired
Type:
Fire Construction Permit
Address NEW:
1151 E HERMANS RD 918
Apply Date:
05/31/2018
Applicant:
Description:
Automatic Fire Extingshing Sys - INSTALLATION OF A NEW WET AUTOMATIC FIRE SPRINKLER SYSTEM.; Commercial Fire Sprinkler Systems - Underground Fire Line Supply; Additional Plan Reviews: 1

Outstanding Inspections

Permit Status: Expired
Permit Number: T18FC00459
Permite Description: Automatic Fire Extingshing Sys - INSTALLATION OF A NEW WET AUTOMATIC FIRE SPRINKLER SYSTEM.; Commercial Fire Sprinkler Systems - Underground Fire Line Supply; Additional Plan Reviews: 1
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/29/2018 COT - FCON - Sprinkler - Final N/A Partial Pass {Activity date: 11/29/2018; Status: Partial Approval; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - Need to lower one head in the electrical room and or add skirt escutcheon. One headed in bathrooms needs to be replaced because it was painted.}

Completed Inspections

Permit Status: Expired
Permit Number: T18FC00459
Permit Description: Automatic Fire Extingshing Sys - INSTALLATION OF A NEW WET AUTOMATIC FIRE SPRINKLER SYSTEM.; Commercial Fire Sprinkler Systems - Underground Fire Line Supply; Additional Plan Reviews: 1
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/02/2018 COT - FCON - Underground Flush Passed {Activity date: 07/02/2018; Status: Approved; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - flushed remote FDC, backflow, riser and standpipe}
11/29/2018 FCON – OH Piping & Hydro Passed {Activity date: 11/29/2018; Status: Approved; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - }
06/07/2018 COT - FCON - Underground Pressure Passed {Activity date: 06/07/2018; Status: Approved; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - }