Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1151 E HERMANS RD
Apply Date:
03/25/2026
Applicant:
ANGEL MORALES
Description:
P.378619 - HAND DIG 1.25" ID TO TIE INTO CUSTOMER VAULT WITH NEW 12CT NON-SHILEDED FIBER FROM EXISTING HH 7917 TO CUST VAULT 1 (10').

Permit Reviews

Permit Number - TR-UTL-0326-00576
Permit Status: Complete
Permit Description: P.378619 - HAND DIG 1.25" ID TO TIE INTO CUSTOMER VAULT WITH NEW 12CT NON-SHILEDED FIBER FROM EXISTING HH 7917 TO CUST VAULT 1 (10').
Start Date Submittal Complete Date Status  
03/26/2026 RIGHT-OF-WAY REVIEW v.1 04/07/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00576
Permit Status: Complete
Permit Description: P.378619 - HAND DIG 1.25" ID TO TIE INTO CUSTOMER VAULT WITH NEW 12CT NON-SHILEDED FIBER FROM EXISTING HH 7917 TO CUST VAULT 1 (10').
Total Outstanding Activity Conditions - 4
Date Name
04/02/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
04/02/2026 ROW Permit is only allowed for work within City of Tucson Right of Way.
04/02/2026 Approved for Work within City of Tucson Right of Way Only. Pima Couty permits will be required for work in and Traffic Control within Pima ROW
04/02/2026 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0326-00576
Permit Description: P.378619 - HAND DIG 1.25" ID TO TIE INTO CUSTOMER VAULT WITH NEW 12CT NON-SHILEDED FIBER FROM EXISTING HH 7917 TO CUST VAULT 1 (10').
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/21/2026 TRSP - ROW - Barricade - Setup/Routine Passed
05/21/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/21/2026 TRSP - ROW - Final Passed