Plan Details

Status:
Void
Type:
Private Improvement Agreement
Address:
N/A
Apply Date:
11/02/2022
Applicant:
N/A
Description:
PIA TR-PIA-1122-00001 was voided due to being created under a "plan" type instead of "permit" type.

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
11/04/2025 TRSP - PIA - Curb Placement Canceled
11/04/2025 TRSP - PIA - AB Placement Canceled
11/04/2025 TRSP - PIA - Roadway Subgrade Canceled
11/04/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Canceled
11/04/2025 TRSP - PIA - Drainage - Pipe Installation/Removal Canceled
11/04/2025 TRSP - PIA - Sidewalk Placement Canceled

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 6
Date Description Inspector Results Comments
03/31/2025 TRSP - PIA - Pre-Construction Meeting Passed I need to contact the City lab to get someone out to grab a proctor of the native soil for future compaction testing.
04/10/2025 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Passed
04/28/2025 TRSP - PIA - Pre-Paving Meeting/Inspection Passed AB was approved and ready to be paved on Friday, April 25th. Density tests of 100% were met.
04/28/2025 TRSP - PIA - Paving Inspection Passed Asphaltic paving took place on both sides of Los Reales from station 10+00 to 30+15. A total of 716 tons were delivered and used (30 trucks). One sample by DTM was taken at 217 tons (truck 9).
10/23/2025 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed Walked the site with GC, Don Williamson, and identified a couple of areas that need "cleaning", but there are no major areas of concern or in need of major repairs. Ponding issue on roadway was the biggest issue and has since been rectified.
11/04/2025 TRSP - PIA - Signage/Striping Final Passed Dean Mullaney/ Victor Antondo Traffic Engineering Technician's request on 10/28/25 Missing sign R3-5F,R3-5R-Sta. 22+31.66 missing skip line Sta 17+90.93- 18+40.88 and missing skip line Sta 29+28.45-30+18.45

Plan Reviews

Plan Number - TR-PIA-1122-00001
Plan Status: Void
Plan Description: PIA TR-PIA-1122-00001 was voided due to being created under a "plan" type instead of "permit" type.
Start Date Submittal Complete Date Status  
11/02/2022 Private Improvement Agreement Review v.1 IN REVIEW Review Details

Documents

File Name Document Type  
1-REV_2_OSIMP REVISION 2 EXPLANATION LETTER_V1.PDF DOCUMENTS VIEW
PIA PERMIT TR-PIA-1122-00001.PDF DOCUMENTS VIEW
4329A - OFFSITE IMPROVEMENTS PLANS - APPROVED 2023.07.06_V1.PDF DOCUMENTS VIEW
4329A - OSIMP REVISION 1 EXPLANATION LETTER_SIGNED_V1.PDF DOCUMENTS VIEW
4329A - OFFSITE IMPROVEMENTS 2023.06.02_V3.PDF DOCUMENTS VIEW
E-MAIL FROM PIMA COUNTY_V1.PDF DOCUMENTS VIEW
4329A - ANNEXATION AND DEVELOPMENT AGREEMENT_V1.PDF DOCUMENTS VIEW
4329A - AZSWPPP_2022_04_28_V1.PDF DOCUMENTS VIEW
4329A - DEVELOPMENT PACKAGE - 2022_09_19_V1.PDF DOCUMENTS VIEW
4329A - GEOTECHNICAL REPORT 212325ST_V1.PDF DOCUMENTS VIEW
4329A - SIGNED PIA APPLICATION_V1.PDF DOCUMENTS VIEW
4329A - UPDATED DRAINAGE REPORT 09.12.2022_V1.PDF DOCUMENTS VIEW