Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 14044004C

Inspection Status: Passed

Inspection History: TRSP - PIA - Paving Inspection

Permit Number - TR-PIA-1122-00001

Inspection Description - TRSP - PIA - Paving Inspection

Inspection Status - Passed

Date Description Inspector Results Comments
04/28/2025 TRSP - PIA - Paving Inspection Passed Asphaltic paving took place on both sides of Los Reales from station 10+00 to 30+15. A total of 716 tons were delivered and used (30 trucks). One sample by DTM was taken at 217 tons (truck 9).
04/29/2025 TRSP - PIA - Paving Inspection Passed Two spots were randomly chosen to core and sample the final asphaltic concrete. They are at stations 15+70 and 21+85.
05/28/2025 TRSP - PIA - Paving Inspection Passed Low spot at Driveway D entrance still has not been addressed.
06/02/2025 TRSP - PIA - Paving Inspection Passed Westbound lane is showing significant ponding as well in the same area that is to be addressed, driveway D entrance.
06/05/2025 TRSP - PIA - Paving Inspection Not Applicable Paving completed on off-site. Ponding issue still pending.
06/09/2025 TRSP - PIA - Paving Inspection Passed I spoke with GC, Don Williamson, and he is still waiting for City of Tucson response to request for fix at driveway D. Other than that drainage/ponding issue, paving has been completed.
07/22/2025 TRSP - PIA - Paving Inspection Passed This was a ponding issue repair located at Driveway D. Approximately 35 tons of asphalt were used to fill in the saw cut area where there was significant (1.5") ponding in the roadway. Vulcan provided the mix and was quality tested by the contractor's QC.
07/23/2025 TRSP - PIA - Paving Inspection Re-inspection required Water test at driveway D due to ponding. There are still areas of concern that need to be addressed before repair and area can be passed.
09/16/2025 TRSP - PIA - Paving Inspection Re-inspection required
09/16/2025 TRSP - PIA - Paving Inspection Re-inspection required Just waiting on water test to check for proper drainage. The rest of the repair went well.
11/04/2025 TRSP - PIA - Paving Inspection Canceled