Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 14044004C

Inspection Status: Passed

Inspection History: TRSP - PIA - Barricade - Setup/Takedown/Routine

Permit Number - TR-PIA-1122-00001

Inspection Description - TRSP - PIA - Barricade - Setup/Takedown/Routine

Inspection Status - Passed

Date Description Inspector Results Comments
04/01/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
04/04/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
04/07/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
04/14/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Partial Pass Traffic control inspection resulted some intervention needed. Multiple VP’s and advanced warning signs need attention.
04/30/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Canceled
04/17/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Partial Pass Flaggers and one lane traffic control inspection.
04/23/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Road has been closed between Alvernon and station 30+00.
05/09/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control has been taken down, and there aren’t any restrictions at this time. All vertical panels, signage, and flaggers have been lifted for over a week now.
05/16/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed No work on offsite
05/28/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control is completely finished as work has shifted on-site.
06/03/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Striping on roadway.
06/04/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control has been taken down due to temporary striping being finished.
06/05/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control has been removed since temporary striping is completed.
06/09/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed All traffic control has been completed for now. There won't be a need until drainage issue is addressed at driveway D.
06/12/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control has been taken down and not in use.
08/08/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control looks good, nothing to change or anything that need to be replaced or cleaned.
11/04/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Canceled