Inspection Status: Passed
Inspection History: TRSP - PIA - Barricade - Setup/Takedown/Routine
| Date |
Description |
Inspector |
Results |
Comments |
| 04/01/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
|
| 04/04/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
|
| 04/07/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
|
| 04/14/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Partial Pass |
Traffic control inspection resulted some intervention needed. Multiple VP’s and advanced warning signs need attention. |
| 04/30/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Canceled |
|
| 04/17/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Partial Pass |
Flaggers and one lane traffic control inspection. |
| 04/23/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Road has been closed between Alvernon and station 30+00. |
| 05/09/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control has been taken down, and there aren’t any restrictions at this time. All vertical panels, signage, and flaggers have been lifted for over a week now. |
| 05/16/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
No work on offsite |
| 05/28/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control is completely finished as work has shifted on-site. |
| 06/03/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Striping on roadway. |
| 06/04/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control has been taken down due to temporary striping being finished. |
| 06/05/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control has been removed since temporary striping is completed. |
| 06/09/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
All traffic control has been completed for now. There won't be a need until drainage issue is addressed at driveway D. |
| 06/12/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control has been taken down and not in use. |
| 08/08/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control looks good, nothing to change or anything that need to be replaced or cleaned. |
| 11/04/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Canceled |
|