Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Passed
Inspection History: TRSP - PIA - Barricade - Setup/Takedown/Routine
| Date |
Description |
Inspector |
Results |
Comments |
| 04/01/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
|
| 04/04/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
|
| 04/07/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
|
| 04/14/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Partial Pass |
Traffic control inspection resulted some intervention needed. Multiple VP’s and advanced warning signs need attention. |
| 04/30/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Canceled |
|
| 04/17/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Partial Pass |
Flaggers and one lane traffic control inspection. |
| 04/23/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Road has been closed between Alvernon and station 30+00. |
| 05/09/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control has been taken down, and there aren’t any restrictions at this time. All vertical panels, signage, and flaggers have been lifted for over a week now. |
| 05/16/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
No work on offsite |
| 05/28/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control is completely finished as work has shifted on-site. |
| 06/03/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Striping on roadway. |
| 06/04/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control has been taken down due to temporary striping being finished. |
| 06/05/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control has been removed since temporary striping is completed. |
| 06/09/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
All traffic control has been completed for now. There won't be a need until drainage issue is addressed at driveway D. |
| 06/12/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control has been taken down and not in use. |
| 08/08/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control looks good, nothing to change or anything that need to be replaced or cleaned. |
| 11/04/2025 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Canceled |
|