Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: TRSP - PIA - Drainage - Pipe Installation/Removal
| Date |
Description |
Inspector |
Results |
Comments |
| 07/29/2025 |
TRSP - PIA - Drainage - Pipe Installation/Removal |
|
Passed |
Headwall for triple barrel RCP drainage. Rebar inspection for floor. |
| 07/30/2025 |
TRSP - PIA - Drainage - Pipe Installation/Removal |
|
Re-inspection required |
Rescheduled pour due to not having approved mix on site. BF was going to pre-mix on site. |
| 07/31/2025 |
TRSP - PIA - Drainage - Pipe Installation/Removal |
|
Passed |
Sample cylinders taken for three barrel drainage head wall base |
| 08/06/2025 |
TRSP - PIA - Drainage - Pipe Installation/Removal |
|
Passed |
Rebar inspection for headwall was done on site at triple barrel drainage along Alvernon just S of Los Reales. #4 rebar was used, spacing was at 8" for 4 foot header wall. One 90 degree bend in the structure. All rebar was in good shape and tied together with metal wire to keep in place and secure. |
| 08/13/2025 |
TRSP - PIA - Drainage - Pipe Installation/Removal |
|
Passed |
Epoxy inspection on Fresno Valves installed on the south side of the RCP pipes. Three in total. Have been installed and functioning properly. |
| 11/04/2025 |
TRSP - PIA - Drainage - Pipe Installation/Removal |
|
Canceled |
|