Permit: TR-PIA-1122-00001
Permit Details
Status:
Approved
Type:
Private Improvement Agreement (PIA)
Address:
4150 E LOS REALES RD
Address NEW:
4150 E LOS REALES RD
Apply Date:
11/21/2022
Applicant:
Aidan Lowry
Description:
Offsite Improvement Plans for I-10 International (Airpark 10) - Along Los Reales Road and Alvernon Way, including new widen roads, asphalt multi-use path, concrete sidewalk, ADA Ramps, header, curb, driveways, drainage retention areas, and new striping
Permit Reviews
Permit Number - TR-PIA-1122-00001
Permit Status: Approved
Permit Description: Offsite Improvement Plans for I-10 International (Airpark 10) - Along Los Reales Road and Alvernon Way, including new widen roads, asphalt multi-use path, concrete sidewalk, ADA Ramps, header, curb, driveways, drainage retention areas, and new striping
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/29/2024 | PRIVATE IMPROVEMENT AGREEMENT REVIEW REVISION v.1 | 01/23/2025 | APPROVED |
| 06/06/2023 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 | 06/30/2023 | APPROVED |
| 03/16/2023 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 | 04/13/2023 | REQUIRES RESUBMIT |
| 12/02/2022 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 | 02/15/2023 | REQUIRES RESUBMIT |
| 07/09/2025 | PRIVATE IMPROVEMENT AGREEMENT REVIEW REVISION v.1 | 07/09/2025 | APPROVED |
Outstanding Inspections
Permit Status: Approved
Permit Number: TR-PIA-1122-00001
Permite Description: Offsite Improvement Plans for I-10 International (Airpark 10) - Along Los Reales Road and Alvernon Way, including new widen roads, asphalt multi-use path, concrete sidewalk, ADA Ramps, header, curb, driveways, drainage retention areas, and new striping
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2025 | TRSP - PIA - Curb Placement | N/A | Canceled | |
| 11/04/2025 | TRSP - PIA - AB Placement | N/A | Canceled | |
| 11/04/2025 | TRSP - PIA - Roadway Subgrade | N/A | Canceled | |
| 11/04/2025 | TRSP - PIA - Barricade - Setup/Takedown/Routine | N/A | Canceled | |
| 11/04/2025 | TRSP - PIA - Drainage - Pipe Installation/Removal | N/A | Canceled | |
| 11/04/2025 | TRSP - PIA - Sidewalk Placement | N/A | Canceled |
Completed Inspections
Permit Status: Approved
Permit Number: TR-PIA-1122-00001
Permit Description: Offsite Improvement Plans for I-10 International (Airpark 10) - Along Los Reales Road and Alvernon Way, including new widen roads, asphalt multi-use path, concrete sidewalk, ADA Ramps, header, curb, driveways, drainage retention areas, and new striping
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2025 | TRSP - PIA - Pre-Construction Meeting | Passed | I need to contact the City lab to get someone out to grab a proctor of the native soil for future compaction testing. | |
| 04/10/2025 | TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork | Passed | ||
| 04/28/2025 | TRSP - PIA - Pre-Paving Meeting/Inspection | Passed | AB was approved and ready to be paved on Friday, April 25th. Density tests of 100% were met. | |
| 10/23/2025 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | Walked the site with GC, Don Williamson, and identified a couple of areas that need "cleaning", but there are no major areas of concern or in need of major repairs. Ponding issue on roadway was the biggest issue and has since been rectified. | |
| 11/04/2025 | TRSP - PIA - Signage/Striping Final | Passed | Dean Mullaney/ Victor Antondo Traffic Engineering Technician's request on 10/28/25 Missing sign R3-5F,R3-5R-Sta. 22+31.66 missing skip line Sta 17+90.93- 18+40.88 and missing skip line Sta 29+28.45-30+18.45 |