Permit: TD-DEV-1124-00319
Permit Details
Status:
Inspections Complete
Type:
Development Package
Address:
5205 E VALENCIA RD
Address NEW:
5205 E VALENCIA RD
Apply Date:
11/26/2024
Applicant:
Description:
McDonald's - Valencia Crossings
Permit Reviews
Permit Number - TD-DEV-1124-00319
Permit Status: Inspections complete
Permit Description: McDonald's - Valencia Crossings
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/16/2025 | DEVELOPMENT PACKAGE NEW v.5 | 04/18/2025 | APPROVED |
| 04/04/2025 | DEVELOPMENT PACKAGE NEW v.4 | 04/14/2025 | REQUIRES RESUBMIT |
| 11/29/2024 | DEVELOPMENT PACKAGE NEW v.1 | 12/10/2024 | REQUIRES RESUBMIT |
| 12/11/2024 | DEVELOPMENT PACKAGE NEW v.2 | 02/06/2025 | REQUIRES RESUBMIT |
| 02/13/2025 | DEVELOPMENT PACKAGE NEW v.3 | 03/19/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-1124-00319
Permit Status: Inspections complete
Permit Description: McDonald's - Valencia Crossings
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/04/2026 | Prior to final - needs review for requests for information, AS-Built will need to be submitted |
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TD-DEV-1124-00319
Permite Description: McDonald's - Valencia Crossings
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | N/A | Partial Pass | 07/24/25, monument board, call board, canopy. Ground to board. All good to pour. |
| 07/25/2025 | COT - FCON - Fire - Final | N/A | Not Applicable | |
| 11/05/2025 | N/A | Partial Pass | Contractor is good to put aggregate base on the subgrade in the parking lot and the drive-through area | |
| 09/18/2025 | ENGR - Drainage Structures | N/A | Partial Pass | Okay to pour2 EF1’s & invert of junction structure |
| 06/25/2025 | For trash and recycling enclosures | N/A | Partial Pass | Rebar spacing and clearance is good, okay to pour slab. |
| 12/18/2025 | LAND Landscape Appearance & Function Final | N/A | Partial Pass | The Landscaped areas adjacent to the building are complete. The areas adjacent to the road are in process of being completed and are almost 100%. Areas along the Street are almost complete with the exception of the area next to the temporary Silting Basin. Areas away from the building on far side of parking lot to the East, North and west are in process. 2 of 3 PIP Were preserved. 1 Fishhook will be mitigated. The Nursery did not do well. Only 2 Palo Verde are viable. TOS mitigation required: 1 Ironwood 2 Palo Verde. 1 Velvet Mesquite 2 Fishhook Barrell Plants and Materials correct in Finished areas. Equipment Correct. Irrigation functioning. Disturbed areas to the East and NE of site will need to have any construction debris removed and the area needs to be revegetated with hydroseed. |
| 10/03/2025 | N/A | Partial Pass | continue installing irrigation lines. | |
| 12/15/2025 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to complete all the landscaping. Contractor needs to patch the area where they had a water leak underneath the asphalt. The entrance on the Valencia going west. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TD-DEV-1124-00319
Permit Description: McDonald's - Valencia Crossings
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Awaiting email from contractor with contact information. | |
| 05/19/2025 | NPPO Pre-Construction | Passed | NPPO items are good. Plants are identified for preservation and protected as necessary, temp nursery location is ready. Okay to begin grubbing. | |
| 09/03/2025 | Passed | Good to backfill all remaining pipe, compaction results can be submitted to both inergov and the portal. | ||
| 12/09/2025 | Passed | |||
| 12/09/2025 | Passed | |||
| 12/15/2025 | SITE - Zoning Final | Passed | ||
| 12/17/2025 | ENGR Paving | Passed | Paving is complete and in accordance with approved plans. | |
| 12/18/2025 | ENGR Grading Final | Passed | 12/18/25 Grading is currently being completed. The West Basin top is built correct to plan. EOR has approved changes to the Temporary Silting Basin. It has not been finished but should be built to the Engineers specifications.This is a Drainage structure and will be inspected as such at Final. | |
| 02/02/2026 | ENGR - Drainage Structures | Passed | ||
| 02/02/2026 | For trash and recycling enclosures | Passed | ||
| 02/04/2026 | LAND Landscape Appearance & Function Final | Passed | 2/4/26 Disturbed areas North and East os site have been cleaned smoothed and hydro seeded. Other areas were DG'd. NPPO was checked and okayed and plants and equipment are in place. Plants look healthy. |
|
| 02/04/2026 | Passed | 2\4\26 Equipment is in place. Irrigation is functioning and plants look to be doing well. |
||
| 02/04/2026 | NPPO Final | Passed | 2/4/26 I went through the history NPPO. Brian initially noted issues but then approved of the nursery. The nursery had a hard time over the summer. But the plants that did survive were replanted and are on irrigation. I can Identify 1 large Palo Verde but unfortunately that is it. The few viable trees that survived that I saw were viable are mixed in. No Barrels survived the nursery. However I have counted 11 Barrels in the landscape and they are doing well. That is more than viable TOS and PIP. The PIP mesquite is doing well and Total amount of Mesquite in landscape is greater than TOS and PIP. Total Palo Verde is also greater than TOS PV I also identified 1 healthy Iron Wood and There was 1 TOS Iron Wood. |
|
| 02/18/2026 | ENGR Engineering Final | Passed |