Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2026 | ENGR Engineering Final | Not Ready | ||
| 02/04/2026 | ENGR Engineering Final | Not Ready | 2/4/26 Silting Basin to far north west of site was not inspected before it was built. I was told it was built per plan with detail A on page C301 and detail 6 on page C800. The dimensions of the toedowns, Key-in at top and the depth of the mortar base of the grouted rip rap were not verified. The 6'x6' W2.1 was not looked at. It will need to be exposed to ensure it is built to plan. I was told the Drainage Structure was build to plan by the GC but unfortunately he was off site and was not notified of this and no pictures were taken. |
|
| 02/18/2026 | ENGR Engineering Final | Passed | ||
| 12/15/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to complete all the landscaping. Contractor needs to patch the area where they had a water leak underneath the asphalt. The entrance on the Valencia going west. |