Inspection Status: Not Ready
Inspection History: ENGR Paving
| Date |
Description |
Inspector |
Results |
Comments |
| 11/12/2025 |
ENGR Paving |
|
Not Ready |
Contractor needs to finish the entryways before we can string line. Will call him tomorrow for reinspection. |
| 11/13/2025 |
ENGR Paving |
|
Partial Pass |
String line to AB at McDonald’s everything looks really good. Contractor will pave tomorrow morning. |
| 12/09/2025 |
ENGR Paving |
|
Partial Pass |
Contractor found a water leak underneath the asphalt by the backflow to the building. Needs to remove the asphalt to find the leak. |
| 12/17/2025 |
ENGR Paving |
|
Passed |
Paving is complete and in accordance with approved plans. |