Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 09/02/2025 |
|
|
Partial Pass |
RCP needs to be a 6" bedding and backfill. Make sure to mud jack between pipes to create a proper bed and fill. Grout any and all areas where pipe separation is evident. |
| 09/03/2025 |
|
|
Passed |
Good to backfill all remaining pipe, compaction results can be submitted to both inergov and the portal. |